Quick answers
What is Majhigawan Stone Qaurry?
Majhigawan Stone Qaurry is a lapsed mining project in Majhigawan, Deosar, Singrauli, Madhya Pradesh. The site covers 8 acres.
Who is building it?
The applicant is Suresh Agrawal.
Has it been approved?
No. The application was lapsed on 23 Jan 2025, so it is no longer under consideration.
Where is it?
In Majhigawan, Deosar, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹55 lakh and a site of 8 acres.
When was it filed?
The application was filed on 23 Jan 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 23 Jan 2025 |
| Application filed | 23 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Suresh Agrawal |
| Land area | 8 acres (3.2 ha) |
| Project cost | ₹55 lakh |
| Village / locality | Majhigawan |
| Taluk / tehsil | Deosar |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-07362 |
In context
268 applications in Singrauli since January 2022 are in the same category (Mining): 152 approved, 40 filed or under review, and 76 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8 acres, this one is smaller than 57% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 9.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Majhigawan, Deosar, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Gadariya Metal Stone Deposit — lapsed, 400 m away
- Parihasi Basemetal (Lead, Copper and Silver) Block — forest land use approved, 2.9 km away
- Expansion of Aluminium Smelter from 3.98 LTPA to 7.96 LTPA and Captive Thermal… — under environmental review, 5 km away
- Proposed Change in Product Mix with 'No Increase in Pollution Load' for… — initial checks, 5 km away
- 2.48 MTPA Wet type (Heavy Media) Coal Washery By Pawsun Industries Private… — environmental approval granted, 6.6 km away
- 2.48 MTPA Wet type (Heavy Media) Coal Washery By Pawsun Industries Private… — cleared for impact study, 6.6 km away
- Work of Augmentation of Water Supply System of Bargawan town under AMRUT 2.0 — lapsed, 7.2 km away
- Kharkata Stone Quarry — lapsed, 8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.