Quick answers
What is Parihasi Basemetal (Lead, Copper and Silver) Block?
Parihasi Basemetal (Lead, Copper and Silver) Block is an approved project in Karri, Deosar, Singrauli, Madhya Pradesh. The site covers 2,396.6 acres.
Who is building it?
The applicant is Vinmir Resources Private Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 19 Nov 2026), as of 27 Nov 2026.
Where is it?
In Karri, Deosar, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹9.3 crore; a site of 2,396.6 acres and 1,427.3 acres (577.6 ha) of forest land.
When was it filed?
The application was filed on 3 Nov 2026.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 19 Nov 2026 |
| Application filed | 3 Nov 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Vinmir Resources Private Limited |
| Land area | 2,396.6 acres (969.9 ha) |
| Forest land | 1,427.3 acres (577.6 ha) |
| Project cost | ₹9.3 crore |
| Village / locality | Karri |
| Taluk / tehsil | Deosar |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09685 |
In context
39 applications in Singrauli since January 2022 are in the same category (Other): 17 approved, 12 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 34 days from filing to approval. At 2,396.6 acres, this one is smaller than 56% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Karri, Deosar, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Majhigawan Stone Qaurry — lapsed, 2.9 km away
- Gadariya Metal Stone Deposit — lapsed, 3.3 km away
- Proposed Change in Product Mix with 'No Increase in Pollution Load' for… — initial checks, 7.7 km away
- Expansion of Aluminium Smelter from 3.98 LTPA to 7.96 LTPA and Captive Thermal… — under environmental review, 7.7 km away
- Bhaudhar to Bagdari Road Length 7.00 Km. — more information requested, 8.4 km away
- 2.48 MTPA Wet type (Heavy Media) Coal Washery By Pawsun Industries Private… — environmental approval granted, 9.2 km away
- 2.48 MTPA Wet type (Heavy Media) Coal Washery By Pawsun Industries Private… — cleared for impact study, 9.2 km away
- Kharkata Stone Quarry — lapsed, 9.4 km away
More from Vinmir Resources Private Limited in Singrauli
- Gulhariya Basemetal (Lead and Copper) Block Gulhariya Basemetal (Lead and… — forest land use approved
All 4 Vinmir Resources projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.