Quick answers
What is Babachiya Stone Quarry?
Babachiya Stone Quarry is an approved mining project in Babachiya, Berasia, Bhopal, Madhya Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is Babaloo Khan.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 3 Feb 2026), as of 27 Nov 2026.
Where is it?
In Babachiya, Berasia, Bhopal, Madhya Pradesh.
How big is it?
It has a stated cost of ₹40 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 10 Oct 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 3 Feb 2026 |
| Application filed | 10 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Babaloo Khan |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Babachiya |
| Taluk / tehsil | Berasia |
| District | Bhopal |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-07588 |
In context
173 applications in Bhopal since January 2022 are in the same category (Mining): 87 approved, 30 filed or under review, and 56 withdrawn, lapsed or rejected. The approved ones took a median of 21 days from filing to approval. At 2.5 acres, this one is smaller than 99% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Babachiya, Berasia, Bhopal, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Manpura Sand Quarry — environmental approval granted, 11.5 km away
- Upgradation work of Existing Water Supply System at Industrial Area Berasia,… — lapsed, 12.5 km away
- Upgradation Existing Water Supply System At I/A Berasia , Dist. Bhopal MP — lapsed, 12.9 km away
- Upgradation Existing Water Supply System At I/A Berasia , Dist Bhoapl MP — more information requested, 14.5 km away
- Pardi Stone Quarry — cleared for impact study, 31.7 km away
- "Pardi Stone Quarry" of Ruma Malik W/o Praween Malik — cleared for impact study, 31.7 km away
- Pardi Stone Quarry of Ruma Malik — cleared for impact study, 31.7 km away
- Laloi Stone Quarry for Temporary Permit — environmental approval granted, 31.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.