Upgradation Existing Water Supply System At I/A Berasia , Dist. Bhopal MP is a lapsed pipeline project in Bosoi, Berasia, Bhopal, Madhya Pradesh. It seeks 1.9 acres of forest land.
Who is building it?
The applicant is Madhya Pradesh Plastic Park Development Corporation Limited.
Has it been approved?
No. The application was lapsed on 2 Jun 2026, so it is no longer under consideration.
Where is it?
In Bosoi, Berasia, Bhopal, Madhya Pradesh.
How big is it?
It has a stated cost of ₹9.6 crore and 1.9 acres (0.8 ha) of forest land.
When was it filed?
The application was filed on 2 Jun 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 2 Jun 2026 |
| Application filed | 2 Jun 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Pipelines |
| Applicant | Madhya Pradesh Plastic Park Development Corporation Limited |
| Forest land | 1.9 acres (0.8 ha) |
| Project cost | ₹9.6 crore |
| Village / locality | Bosoi |
| Taluk / tehsil | Berasia |
| District | Bhopal |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11730 |
In context
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bosoi, Berasia, Bhopal, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Upgradation work of Existing Water Supply System at Industrial Area Berasia,… — lapsed, 1 km away
- Manpura Sand Quarry — environmental approval granted, 3.3 km away
- Upgradation Existing Water Supply System At I/A Berasia , Dist Bhoapl MP — more information requested, 4.8 km away
- Babachiya Stone Quarry — environmental approval granted, 12.9 km away
- Laloi Stone Quarry for Temporary Permit — environmental approval granted, 21.9 km away
- Laloi Stone Quarry for Temporary Permit — lapsed, 21.9 km away
- Richchai Tank Project — more information requested, 23.9 km away
- Dehriya Kalan Murrum Quarry Lease — lapsed, 25.7 km away
More from Madhya Pradesh Plastic Park Development Corporation Limited in Bhopal
- Upgradation Existing Water Supply System At I/A Berasia , Dist Bhoapl MP — more information requested
- Upgradation work of Existing Water Supply System at Industrial Area Berasia,… — lapsed
- 33 KV HT Electrical line from I/A Bagroda 132 KV Substation to 33/11 KV… — under forest review
- Laying of Underground Pipe Line Under Water Supply Scheme for Industrial Area… — more information requested
5 Madhya Pradesh Plastic Park Development Corporation projects in Bhopal
All 19 Madhya Pradesh Plastic Park Development Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.