What is Flag Stone Quarry Lease?
Flag Stone Quarry Lease is a lapsed mining project in Gaddi, Gurh, Rewa, Madhya Pradesh. The site covers 2.9 acres.
Who is building it?
The applicant is Anil Patel.
Has it been approved?
No. The application was lapsed on 2 Dec 2024, so it is no longer under consideration.
Where is it?
In Gaddi, Gurh, Rewa, Madhya Pradesh.
How big is it?
It has a stated cost of ₹35 lakh and a site of 2.9 acres.
When was it filed?
The application was filed on 2 Dec 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 2 Dec 2024 |
| Application filed | 2 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Anil Patel |
| Land area | 2.9 acres (1.2 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Gaddi |
| Taluk / tehsil | Gurh |
| District | Rewa |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-07729 |
In context
177 applications in Rewa since January 2022 are in the same category (Mining): 70 approved, 25 filed or under review, and 82 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.9 acres, this one is smaller than 83% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Gaddi, Gurh, Rewa, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Obtaining Environment Clearance in B-2 Category for 1.167 Ha Gaddi Flag Stone… — under environmental review, 0 m away
- Village Teekar to dhuar Pcc road — lapsed, 6.4 km away
- Proposed Grain Based Distillery Capacity 130 KLD Fuel Ethanol by M/s. Bhairav… — environmental approval granted, 6.5 km away
- Tikar Bauxite & White Clay Mine — cleared for impact study, 6.7 km away
- Tikar Bauxite Mine (32.00 Hect.) — lapsed, 6.8 km away
- Tikar Bauxite Mine (32.00 Hect.) — lapsed, 6.8 km away
- Transmission Lines associated with 400/220/132kV Substation in Gurh, Rewa — forest land use approved, 7.8 km away
- Tikar Bauxite Block ( Mine lease area – 95.26 Ha) by M/s. Katni Minerals… — cleared for impact study, 8.7 km away
More from Anil Patel in Rewa
- Obtaining Environment Clearance in B-2 Category for 1.167 Ha Gaddi Flag Stone… — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.