Obtaining Environment Clearance in B-2 Category for 1.167 Ha Gaddi Flag Stone Quarry Lease With Production Capacity of Rom 6727 Cubic Meter Per Year (Flagstone = 4036 Cubic Meter Year, 961 Cubic Meter Per Year of Overburden and 1730 Cubic Meter Year of Mineral Reject) by Anil Kumar Patel

Obtaining Environment Clearance in B-2 Category for 1.167 Ha Gaddi Flag Stone Quarry Lease With Production Capacity of Rom 6727 Cubic Meter Per Year (Flagstone = 4036 Cubic Meter Year, 961 Cubic Meter Per Year of Overburden and 1730 Cubic Meter Year of Mineral Reject) by Anil Kumar Patel is a proposed mining project in Gaddi, Gurh, Rewa, Madhya Pradesh. The site covers 2.9 acres. Its stated project cost is ₹50 lakh. As of 27 Nov 2026, its status is “Under environmental review” (since 19 Nov 2026).

See it on the live map All projects in Rewa

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Obtaining Environment Clearance in B-2 Category for 1.167 Ha Gaddi Flag Stone Quarry Lease With Production Capacity of Rom 6727 Cubic Meter Per Year (Flagstone = 4036 Cubic Meter Year, 961 Cubic Meter Per Year of Overburden and 1730 Cubic Meter Year of Mineral Reject) by Anil Kumar Patel is a proposed mining project in Gaddi, Gurh, Rewa, Madhya Pradesh. The site covers 2.9 acres.

Who is building it?

The applicant is Anil Patel.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Gaddi, Gurh, Rewa, Madhya Pradesh.

How big is it?

It has a stated cost of ₹50 lakh and a site of 2.9 acres.

When was it filed?

The application was filed on 12 Aug 2026.

Project details

Official titleObtaining Environment Clearance in B-2 Category for 1.167 Ha Gaddi Flag Stone Quarry Lease With Production Capacity of Rom 6727 Cubic Meter Per Year (Flagstone = 4036 Cubic Meter Year, 961 Cubic Meter Per Year of Overburden and 1730 Cubic Meter Year of Mineral Reject) at Village Gaddi, Tehsil – Gurh, District – Rewa (M.P.) Proposed by Anil Kumar Patel
StatusUnder environmental review
Status since19 Nov 2026
Application filed12 Aug 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantAnil Patel
Land area2.9 acres (1.2 ha)
Project cost₹50 lakh
Village / localityGaddi
Taluk / tehsilGurh
DistrictRewa
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-08004

In context

177 applications in Rewa since January 2022 are in the same category (Mining): 70 approved, 25 filed or under review, and 82 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.9 acres, this one is smaller than 83% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Gaddi, Gurh, Rewa, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.