Project details
| Status | Lapsed |
|---|---|
| Status since | 6 Jun 2026 |
| Application filed | 29 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Kartik Solarworld Private Limited |
| Land area | 34.3 acres (13.9 ha) |
| Project cost | ₹1,300 crore |
| Village / locality | Khapa Karimwar |
| Taluk / tehsil | Sausar |
| District | Chhindwara |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-08172 |
In context
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khapa Karimwar, Sausar, Chhindwara, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Grain based Distillery Plant from 180 KLPD to 300 KLPD by M/s.… — under environmental review, 4.7 km away
- No Increase Pollution Load (NIPL) 50% increase from EC Capacity 120 KLPD to… — initial checks, 4.8 km away
- Proposed 120 KLPD Grain based Ethanol Plant by M/s. UKR Industries Limited — initial checks, 4.8 km away
- Proposed 120 KLPD Grain based Ethanol Plant by M/s. UKR Industries Limited — environmental approval granted, 4.8 km away
- Industrial project by Premier Synthochem Industries Pvt. Ltd. — cleared for impact study, 5.4 km away
- Sawanga Sand Quarry (Quarry lease); Area 2 Ha, Production 18000 m3/year, At… — environmental approval granted, 5.8 km away
- Sangam 1 Sand Quarry; Quarry lease area 3.0 Ha, Production 17,100 m3/year at… — environmental approval granted, 6.1 km away
- No Increase Pollution Load (NIPL) 50% increase from EC Capacity 500 KLPD to… — initial checks, 6.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.