Quick answers
What is this project?
Proposed 2.48 MTPA Coal Washery Project by Mahavir Coal Resources Private Limited (Unit-II) is a proposed mining project in Mahdeiya, Chitrangi, Singrauli, Madhya Pradesh. The site covers 26.2 acres.
Who is building it?
The applicant is Mahavir Coal Resources Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 8 Oct 2026), as of 27 Nov 2026.
Where is it?
In Mahdeiya, Chitrangi, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹28.1 crore and a site of 26.2 acres.
When was it filed?
The application was filed on 21 Aug 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 8 Oct 2026 |
| Application filed | 21 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Mahavir Coal Resources Private Limited |
| Land area | 26.2 acres (10.6 ha) |
| Project cost | ₹28.1 crore |
| Village / locality | Mahdeiya |
| Taluk / tehsil | Chitrangi |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09062 |
In context
268 applications in Singrauli since January 2022 are in the same category (Mining): 152 approved, 40 filed or under review, and 76 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 26.2 acres, this one is larger than 73% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Mahdeiya, Chitrangi, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — forest land use approved, 400 m away
- Block-B Expansion Project — forest land use approved, 3.2 km away
- Block-B Expansion OCP Project — environmental approval granted, 3.2 km away
- Block-B Expansion OCP Project — environmental approval granted, 3.2 km away
- Block-B Expansion OCP Project — cleared for impact study, 3.2 km away
- Block-B Expansion OCP NCL — lapsed, 3.2 km away
- Block-B Expansion OCP NCL — lapsed, 3.2 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.