Quick answers
What is this project?
Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal road authority route Kathas - Kasar DFO Waidhan (Singrauli) is a lapsed telecom project in Chmmarkhoh, Chitrangi, Singrauli, Madhya Pradesh. The site covers 0 acres.
Who is building it?
The applicant is Jio Digital Fibre Private LTD.
Has it been approved?
No. The application was lapsed on 1 Jul 2025, so it is no longer under consideration.
Where is it?
In Chmmarkhoh, Chitrangi, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹48 lakh; a site of 0 acres and 3,500 m² of forest land.
When was it filed?
The application was filed on 26 Nov 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 1 Jul 2025 |
| Application filed | 26 Nov 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Jio Digital Fibre Private LTD |
| Land area | 200 m² |
| Forest land | 3,500 m² |
| Project cost | ₹48 lakh |
| Village / locality | Chmmarkhoh |
| Taluk / tehsil | Chitrangi |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10211 |
In context
10 applications in Singrauli since January 2022 are in the same category (Telecom): 7 approved, 0 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 0 acres, this one is smaller than 90% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chmmarkhoh, Chitrangi, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing Wet Type Coal Washery Project based on Heavy Media… — environmental approval granted, 2 km away
- Transfer of Environment Clearance (EC), EC amendment and EC for Expansion… — environmental approval granted, 2 km away
- Block-B Expansion OCP NCL — lapsed, 3.2 km away
- Proposed 2.48 MTPA Coal Washery Project by Mahavir Coal Resources Private… — cleared for impact study, 3.2 km away
- Block-B Expansion Project — forest land use approved, 3.4 km away
- Block-B Expansion OCP Project — environmental approval granted, 3.4 km away
- Block-B Expansion OCP Project — environmental approval granted, 3.4 km away
- Block-B Expansion OCP Project — cleared for impact study, 3.4 km away
More from Jio Digital Fibre Private LTD in Singrauli
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — forest land use approved
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — lapsed
6 Jio Digital Fibre projects in Singrauli
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.