Quick answers
What is this project?
Two laning of Hiwarkhedi-Basinda- Roshni Section of NH-347B (Old SH-26) from Betul Design CH 0+000 to Roshni Design CH 89+900 (length-89+900 km) of Betul Khandwa economic corridor under NH(O) in the state of Madhya Pradesh on EPC Mode-Pkg 1&2 is an approved road project in Rf, Betul, Madhya Pradesh. The site covers 747.8 acres.
Who is building it?
The applicant is National Highways Authority of India (NHAI).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 23 Nov 2026), as of 27 Nov 2026.
Where is it?
In Rf, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹1,182.6 crore; a site of 747.8 acres and 405.7 acres (164.2 ha) of forest land.
When was it filed?
The application was filed on 8 May 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 23 Nov 2026 |
| Application filed | 8 May 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | National Highways Authority of India (NHAI) |
| Land area | 747.8 acres (302.6 ha) |
| Forest land | 405.7 acres (164.2 ha) |
| Project cost | ₹1,182.6 crore |
| Village / locality | Rf |
| Taluk / tehsil | Betul |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09170 |
In context
15 applications in Betul since January 2022 are in the same category (Roads & highways): 1 approved, 7 filed or under review, and 7 withdrawn, lapsed or rejected. At 747.8 acres, this one is larger than 92% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rf, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Temporary Rectification Cutting of Hilly Portion & Extra Widening of Inner… — more information requested, 3.2 km away
- Temporary Rectification Cutting of Hilly Portion & Extra Widening of Inner… — more information requested, 3.2 km away
- Bsnl 4g Saturation Project — lapsed, 4.1 km away
- Bsnl 4g Saturation Project — lapsed, 4.1 km away
- 11 KV Chillor Mix feeder, FSP works under RDSS KfW(FSP) package — more information requested, 4.6 km away
- 33 KV Interconnection line form Bhimpur to Chillore Teh, Bhimpur Dist Betul… — more information requested, 6.2 km away
- 11 KV Batki Mix feeder, FSP works under RDSS KfW (FSP) package — under wildlife review, 6.3 km away
- 11 KV Batki Mix feeder, FSP works under RDSS KfW (FSP) package — more information requested, 6.3 km away
More from National Highways Authority of India (NHAI) in Betul
- Two laning of Hiwarkhedi-Basinda- Roshni Section of NH-347B (Old SH-26) from… — decision issued
- Two laning of Patajan-Basina- Roshni Section of NH-347B (Old SH-26) from Betul… — lapsed
3 National Highways Authority of India (NHAI) projects in Betul
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.