Quick answers
What is this project?
Two laning of Hiwarkhedi-Basinda- Roshni Section of NH-347B (Old SH-26) from Betul Design CH 0+000 to Roshni Design CH 89+900 (length-89+900 km) of Betul Khandwa economic corridor under NH(O) in the state of Madhya Pradesh on EPC Mode-Pkg 1&2 is a project in Makra, Bhainsdehi, Betul, Madhya Pradesh. The site covers 84,248.2 acres.
Who is building it?
The applicant is National Highways Authority of India (NHAI).
Has it been approved?
Yes. Its status is “Decision issued” (since 6 Sept 2024), as of 27 Nov 2026.
Where is it?
In Makra, Bhainsdehi, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹1,182.6 crore and a site of 84,248.2 acres.
When was it filed?
The application was filed on 6 Sept 2024.
Project details
| Status | Decision issued |
|---|---|
| Status since | 6 Sept 2024 |
| Application filed | 6 Sept 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | National Highways Authority of India (NHAI) |
| Land area | 84,248.2 acres (34,094.1 ha) |
| Project cost | ₹1,182.6 crore |
| Village / locality | Makra |
| Taluk / tehsil | Bhainsdehi |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11909 |
In context
13 applications in Betul since January 2022 are in the same category (Other): 0 approved, 5 filed or under review, and 7 withdrawn, lapsed or rejected. At 84,248.2 acres, this one is larger than 92% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Makra, Bhainsdehi, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Two laning of Patajan-Basina- Roshni Section of NH-347B (Old SH-26) from Betul… — lapsed, 2.8 km away
- 11 KV Jirudhana Mix feeder, FSP works under RDSS KfW (FSP) package under — forest land use approved, 6.2 km away
- 4g Saturation Project Under 500 Days — lapsed, 8.4 km away
- Bsnl 4g Saturation Project — lapsed, 8.4 km away
- Bsnl 4g Saturation Project — lapsed, 8.5 km away
- Bsnl 4g Saturation Project — lapsed, 10 km away
- Bsnl 4g Saturation Project — lapsed, 10 km away
- 11 KV Chillor Mix feeder, FSP works under RDSS KfW(FSP) package — more information requested, 10 km away
More from National Highways Authority of India (NHAI) in Betul
- Two laning of Hiwarkhedi-Basinda- Roshni Section of NH-347B (Old SH-26) from… — forest land use approved
- Two laning of Patajan-Basina- Roshni Section of NH-347B (Old SH-26) from Betul… — lapsed
3 National Highways Authority of India (NHAI) projects in Betul
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.