Quick answers
What is this project?
Two laning of Patajan-Basina- Roshni Section of NH-347B (Old SH-26) from Betul Design CH 0+000 to Roshni Design CH 89+900 (length-89+900 km) of Betul Khandwa economic corridor under NH(O) in the state of Madhya Pradesh on EPC Mode-Pkg 1&2 is a lapsed road project in Mohdadhana, Bhainsdehi, Betul, Madhya Pradesh. It seeks 342.1 acres of forest land.
Who is building it?
The applicant is National Highways Authority of India (NHAI).
Has it been approved?
No. The application was lapsed on 31 May 2024, so it is no longer under consideration.
Where is it?
In Mohdadhana, Bhainsdehi, Betul, Madhya Pradesh.
How big is it?
It has 342.1 acres (138.4 ha) of forest land.
When was it filed?
The application was filed on 16 May 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 31 May 2024 |
| Application filed | 16 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | National Highways Authority of India (NHAI) |
| Forest land | 342.1 acres (138.4 ha) |
| Village / locality | Mohdadhana |
| Taluk / tehsil | Bhainsdehi |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11468 |
In context
15 applications in Betul since January 2022 are in the same category (Roads & highways): 1 approved, 7 filed or under review, and 7 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mohdadhana, Bhainsdehi, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Two laning of Hiwarkhedi-Basinda- Roshni Section of NH-347B (Old SH-26) from… — decision issued, 2.8 km away
- 11 KV Jirudhana Mix feeder, FSP works under RDSS KfW (FSP) package under — forest land use approved, 8 km away
- 11 KV Deshli Mix Feeder, FSP Works under RDSS KfW(FSP) package — under forest review, 9.2 km away
- 4g Saturation Project Under 500 Days — lapsed, 10.9 km away
- Bsnl 4g Saturation Project — lapsed, 10.9 km away
- Bsnl 4g Saturation Project — lapsed, 11 km away
- 11 KV Kamod Mix Feeder, FSP Works under RDSS KfW(FSP) package — more information requested, 12.2 km away
- 11 KV Chillor Mix feeder, FSP works under RDSS KfW(FSP) package — more information requested, 12.7 km away
More from National Highways Authority of India (NHAI) in Betul
- Two laning of Hiwarkhedi-Basinda- Roshni Section of NH-347B (Old SH-26) from… — forest land use approved
- Two laning of Hiwarkhedi-Basinda- Roshni Section of NH-347B (Old SH-26) from… — decision issued
3 National Highways Authority of India (NHAI) projects in Betul
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.