What is Developing? Open the mapMap

LapsedPower · Sagar, Madhya Pradesh

Malthon Multi Village Rural Water Supply Scheme

Malthon Multi Village Rural Water Supply Scheme is a lapsed power project in Imaliya, Malthon, Sagar, Madhya Pradesh. The site covers 98.7 acres. Its stated project cost is ₹89 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 2 Mar 2025).

See it on the live map All projects in Sagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since2 Mar 2025
Application filed22 Jan 2025
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantMadhya Pradesh Jal Nigam
Land area98.7 acres (40 ha)
Forest land22 acres (8.9 ha)
Project cost₹89 lakh
Village / localityImaliya
Taluk / tehsilMalthon
DistrictSagar
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-09192

In context

13 applications in Sagar since January 2022 are in the same category (Power): 5 approved, 2 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 17 months from filing to approval. At 98.7 acres, this one is smaller than 67% of them.

8 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Imaliya, Malthon, Sagar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Madhya Pradesh Jal Nigam in Sagar

5 Madhya Pradesh Jal Nigam projects in Sagar
All 20 Madhya Pradesh Jal Nigam projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.