What is Developing? Open the mapMap

LapsedWater & irrigation · Sagar, Madhya Pradesh

Malthon Multi Village Drinking Water Supply Scheme

Malthon Multi Village Drinking Water Supply Scheme is a lapsed water and irrigation project in Imaliya, Malthon, Sagar, Madhya Pradesh. The site covers 100.5 acres. Its stated project cost is ₹1.1 crore. As of 27 Nov 2026, its status is “Lapsed” (since 30 Dec 2024).

See it on the live map All projects in Sagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since30 Dec 2024
Application filed28 Nov 2024
Approval soughtForest land use
Application typeNew project
SectorWater & irrigation
ApplicantMadhya Pradesh Jal Nigam
Land area100.5 acres (40.7 ha)
Forest land22 acres (8.9 ha)
Project cost₹1.1 crore
Village / localityImaliya
Taluk / tehsilMalthon
DistrictSagar
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-11031

In context

23 applications in Sagar since January 2022 are in the same category (Water & irrigation): 7 approved, 6 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 16 months from filing to approval. At 100.5 acres, this one is smaller than 57% of them.

8 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Imaliya, Malthon, Sagar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Madhya Pradesh Jal Nigam in Sagar

5 Madhya Pradesh Jal Nigam projects in Sagar
All 20 Madhya Pradesh Jal Nigam projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.