Quick answers
What is 33/11 KV S/s Malgaon?
33/11 KV S/s Malgaon is an approved power project in Malgaon, Khalwa, East Nimar, Madhya Pradesh. The site covers 0.5 acres.
Who is building it?
The applicant is Executive Engineer Mpeb.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 9 May 2023), as of 27 Nov 2026.
Where is it?
In Malgaon, Khalwa, East Nimar, Madhya Pradesh.
How big is it?
It has a stated cost of ₹1.8 crore; a site of 0.5 acres and 2,000 m² of forest land.
When was it filed?
The application was filed on 15 Dec 2022.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 9 May 2023 |
| Application filed | 15 Dec 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Executive Engineer Mpeb |
| Land area | 2,000 m² |
| Forest land | 2,000 m² |
| Project cost | ₹1.8 crore |
| Village / locality | Malgaon |
| Taluk / tehsil | Khalwa |
| District | East Nimar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10134 |
In context
16 applications in East Nimar since January 2022 are in the same category (Power): 8 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0.5 acres, this one is smaller than 93% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Malgaon, Khalwa, East Nimar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 132 KV Transmission Line to Pump House 1 & 2 of Khandwa Micro Lift Irrigation… — under forest review, 2.3 km away
- Khandwa Chanera Forest Permission — lapsed, 5.1 km away
- Construction of Madni to Harivanshpura Road — in-principle approval, conditions pending, 6.9 km away
- Khandwa Micro Lift Irrigation Project (Underground Pipeline). — forest land use approved, 8.7 km away
- Amrut 2.0 — forest land use approved, 9.2 km away
- SIWANA CRUSHER STONE QUARRY, AREA- 1.00 Ha. — environmental approval granted, 11 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed, 11.8 km away
- Diversion of 0.0411 Ha of Forest Land for Construction of Mobile Tower — lapsed, 12.9 km away
More from Executive Engineer Mpeb in East Nimar
- 33/11 KV Substation Omkareshwar Simhast 2028 — more information requested
- New 33 KV Line Jhinjhari — more information requested
- 11 KV Badkhaliya Irr Feeder Bifurcation — more information requested
- 33KV Roshani Feeder Bifurcation — more information requested
- Interconnection of 33 KV Mundi Fdr(Diat) to 33/11 KV Substation Devla — lapsed
- 33/11 KV S/s Patajan — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.