Project details
| Status | Lapsed |
|---|---|
| Status since | 15 May 2025 |
| Application filed | 10 May 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 30 m² |
| Project cost | ₹8 lakh |
| Village / locality | Sardoni Retwari |
| Taluk / tehsil | Sausar |
| District | Chhindwara |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09451 |
In context
20 applications in Chhindwara since January 2022 are in the same category (Telecom): 7 approved, 5 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 0 acres, this one is smaller than 100% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sardoni Retwari, Sausar, Chhindwara, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bhivdoni Quartz & Quartzite Mine — more information requested, 1.4 km away
- Bhivdoni Quartz & Quartzite Mine — withdrawn, 1.4 km away
- Mehandi 1 Sand Quarry; Quarry lease area 3.50 Ha, Production 25,830 m3/year at… — environmental approval granted, 7.8 km away
- Interconnection of 11 kv Line form Village Badosa to Chakhara — more information requested, 7.8 km away
- Hivrakhanderaywar Sand Quarry (Quarry lease); Area 2 Ha, Production 11880… — more information requested, 7.8 km away
- Mehandi - 2 Sand Quarry (Quarry lease); Area 3.50 Ha, Production 21000… — environmental approval granted, 7.9 km away
- Mathni Sand Quarry (Quarry lease); Area 2 Ha, Production 2040 m3/year, At… — under environmental review, 8.1 km away
- Mehandi 3 Sand Quarry; Quarry lease area 3.50 Ha, Production 18,690 m3/year at… — environmental approval granted, 8.3 km away
More from Mahesh Nair in Chhindwara
- 4g Saturation Project in Chhindwara Operational Area — initial checks
- 4g Saturation Project in Sausar and Pandhurna Block Under Chhindwara… — initial checks
- "Land Acquisition Process for 4G Mobile Towers in Parasia, Tamia, and… — under forest review
- Chhindwara M.P. 4g Saturation Project Land Acquisition — withdrawn
- Forest Row Application for Bsnl Ofc Laying Under 4g Saturation Project in East… — lapsed
- Forest Row Application for Bsnl Ofc Laying Under 4g Saturation Project in… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.