Project details
| Status | Withdrawn |
|---|---|
| Status since | 26 Nov 2026 |
| Application filed | 20 Jul 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Project cost | ₹1.5 crore |
| Village / locality | Sundrehi |
| Taluk / tehsil | Umreth |
| District | Chhindwara |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10620 |
In context
20 applications in Chhindwara since January 2022 are in the same category (Telecom): 7 approved, 5 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 0 acres, this one is smaller than 100% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sundrehi, Umreth, Chhindwara, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sindrai Guraiyathar Sand Quarry; Quarry lease area 5.0 Ha, Production 2700… — environmental approval granted, 750 m away
- Jogimuar to Mainikhapa OFC Laying — forest land use approved, 3.2 km away
- Avariya Sand Quarry; Quarry lease area 5.0 Ha, Production 3000 m3/year at… — environmental approval granted, 6.1 km away
- Preliminary Exploration (G3) for PGE and Associated Mineral in… — lapsed, 6.4 km away
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — forest land use approved, 9.2 km away
- Sangam 1 Dam Project — initial checks, 9.6 km away
- Machagora Multi village scheme — lapsed, 10.9 km away
- "Land Acquisition Process for 4G Mobile Towers in Parasia, Tamia, and… — under forest review, 12.2 km away
More from Mahesh Nair in Chhindwara
- 4g Saturation Project in Chhindwara Operational Area — initial checks
- 4g Saturation Project in Sausar and Pandhurna Block Under Chhindwara… — initial checks
- "Land Acquisition Process for 4G Mobile Towers in Parasia, Tamia, and… — under forest review
- Forest Row Application for Bsnl Ofc Laying Under 4g Saturation Project in East… — lapsed
- Forest Row Application for Bsnl Ofc Laying Under 4g Saturation Project in… — lapsed
- Forest Row Application for Bsnl Ofc Laying Under 4g Saturation Project in… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.