Quick answers
What is this project?
Bharti Airtel Limited Project Ghegaon_Dhamanya-Guwada route, district Barwani M.P is an approved telecom project in Balvadi, Varla, Barwani, Madhya Pradesh. The site covers 1.3 acres.
Who is building it?
The applicant is Prabhat.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 8 Apr 2026), as of 27 Nov 2026.
Where is it?
In Balvadi, Varla, Barwani, Madhya Pradesh.
How big is it?
It has a stated cost of ₹30 lakh; a site of 1.3 acres and 1.3 acres (0.5 ha) of forest land.
When was it filed?
The application was filed on 9 Mar 2026.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 8 Apr 2026 |
| Application filed | 9 Mar 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Prabhat |
| Land area | 1.3 acres (0.5 ha) |
| Forest land | 1.3 acres (0.5 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Balvadi |
| Taluk / tehsil | Varla |
| District | Barwani |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09606 |
In context
6 applications in Barwani since January 2022 are in the same category (Telecom): 4 approved, 0 filed or under review, and 2 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Balvadi, Varla, Barwani, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 33/11 KV Sub Station Sonkhedi — initial checks, 1.7 km away
- 33/11 KV Sub Station Sonkhedi (Under SSTD Scheme 2026-27) — lapsed, 1.7 km away
- Jio Digital Fiber Pvt. Ltd. Linear OFC 5G Project In Row Corridor Of Principal… — forest land use approved, 8.9 km away
- Jio Digital Fiber Pvt. Ltd. Linear OFC 5G Project In Row Corridor Of Principal… — lapsed, 8.9 km away
- Adnadi to Rulibad Hathigudiya Road — lapsed, 10 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed, 16.9 km away
- Khurmabad to Navni Road — lapsed, 18.5 km away
- 33/11 KV Ramgadhi Grid — lapsed, 19.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.