Quick answers
What is this project?
Jio Digital Fiber Pvt. Ltd. Linear OFC 5G Project In Row Corridor Of Principal Road Authority Dhawali-Sirvel Route DFO Sendhwa is an approved road project in Balvadi, Varla, Barwani, Madhya Pradesh. It seeks 3.8 acres of forest land.
Who is building it?
The applicant is Jio Digital Fibre Private LTD.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 9 Mar 2024), as of 27 Nov 2026.
Where is it?
In Balvadi, Varla, Barwani, Madhya Pradesh.
How big is it?
It has a stated cost of ₹48 lakh and 3.8 acres (1.5 ha) of forest land.
When was it filed?
The application was filed on 23 Feb 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 9 Mar 2024 |
| Application filed | 23 Feb 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Jio Digital Fibre Private LTD |
| Forest land | 3.8 acres (1.5 ha) |
| Project cost | ₹48 lakh |
| Village / locality | Balvadi |
| Taluk / tehsil | Varla |
| District | Barwani |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10938 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 23 Feb 2024 (this page) | Forest land use approved | ₹48 lakh | |
| Change of use filed 18 Feb 2024 | Lapsed | ₹48 lakh |
In context
17 applications in Barwani since January 2022 are in the same category (Roads & highways): 9 approved, 1 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 20 months from filing to approval.
Where it is
Balvadi, Varla, Barwani, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jio Digital Fiber Pvt. Ltd. Linear OFC 5G Project In Row Corridor Of Principal… — lapsed, 0 m away
- Bharti Airtel Limited Project Ghegaon_Dhamanya-Guwada route, district Barwani… — forest land use approved, 8.9 km away
- 33/11 KV Sub Station Sonkhedi — initial checks, 10.5 km away
- 33/11 KV Sub Station Sonkhedi (Under SSTD Scheme 2026-27) — lapsed, 10.5 km away
- Khurmabad to Navni Road — lapsed, 14.7 km away
- Silariya to Palaspani Road — lapsed, 15.4 km away
- GSB Road & Slab Culvert at Chachariyapati (Kanyapani),P.S School and… — lapsed, 15.5 km away
- 33/11 KV Ramgadhi Grid — lapsed, 17.1 km away
More from Jio Digital Fibre Private LTD in Barwani
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — forest land use approved
- Jio Digital Fiber Pvt. Ltd. Linear OFC 5G Project In Row Corridor Of Principal… — lapsed
10 Jio Digital Fibre projects in Barwani
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.