What is Developing? Open the mapMap

LapsedRoads & highways · Barwani, Madhya Pradesh

Jio Digital Fiber Pvt. Ltd. Linear OFC 5G Project In Row Corridor Of Principal Road Authority Dhawali-Sirvel Route DFO Sendhwa

Jio Digital Fiber Pvt. Ltd. Linear OFC 5G Project In Row Corridor Of Principal Road Authority Dhawali-Sirvel Route DFO Sendhwa is a lapsed road project in Balvadi, Varla, Barwani, Madhya Pradesh. It seeks 1.9 acres of forest land. Its stated project cost is ₹48 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 20 May 2024).

See it on the live map All projects in Barwani

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Jio Digital Fiber Pvt. Ltd. Linear OFC 5G Project In Row Corridor Of Principal Road Authority Dhawali-Sirvel Route DFO Sendhwa is a lapsed road project in Balvadi, Varla, Barwani, Madhya Pradesh. It seeks 1.9 acres of forest land.

Who is building it?

The applicant is Jio Digital Fibre Private LTD.

Has it been approved?

No. The application was lapsed on 20 May 2024, so it is no longer under consideration.

Where is it?

In Balvadi, Varla, Barwani, Madhya Pradesh.

How big is it?

It has a stated cost of ₹48 lakh and 1.9 acres (0.8 ha) of forest land.

When was it filed?

The application was filed on 18 Feb 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Jio Digital Fiber Pvt. Ltd. Linear OFC 5G Project In Row Corridor Of Principal Road…

Project details

StatusLapsed
Status since20 May 2024
Application filed18 Feb 2024
Approval soughtForest land use
Application typeChange of use
SectorRoads & highways
ApplicantJio Digital Fibre Private LTD
Forest land1.9 acres (0.8 ha)
Project cost₹48 lakh
Village / localityBalvadi
Taluk / tehsilVarla
DistrictBarwani
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-09690

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Change of use filed 23 Feb 2024Forest land use approved₹48 lakh
Change of use filed 18 Feb 2024 (this page)Lapsed₹48 lakh

In context

17 applications in Barwani since January 2022 are in the same category (Roads & highways): 9 approved, 1 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 20 months from filing to approval.

Where it is

Balvadi, Varla, Barwani, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jio Digital Fibre Private LTD in Barwani

10 Jio Digital Fibre projects in Barwani
All 787 Jio Digital Fibre projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.