Quick answers
What is Bhaudhar to Bagdari Road Length 7.00 Km.?
Bhaudhar to Bagdari Road Length 7.00 Km is a proposed road project in Bagadari, Chitrangi, Singrauli, Madhya Pradesh. The site covers 13.3 acres.
Who is building it?
The applicant is Executive Engineer Pwd Div Singrauli.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Bagadari, Chitrangi, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹8.5 crore; a site of 13.3 acres and 5.6 acres (2.3 ha) of forest land.
When was it filed?
The application was filed on 15 Feb 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 20 Jul 2026 |
| Application filed | 15 Feb 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer Pwd Div Singrauli |
| Land area | 13.3 acres (5.4 ha) |
| Forest land | 5.6 acres (2.3 ha) |
| Project cost | ₹8.5 crore |
| Village / locality | Bagadari |
| Taluk / tehsil | Chitrangi |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11002 |
In context
27 applications in Singrauli since January 2022 are in the same category (Roads & highways): 6 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 14 months from filing to approval. At 13.3 acres, this one is larger than 70% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bagadari, Chitrangi, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kharkata Stone Quarry — lapsed, 4.8 km away
- Strengthning for Pondi No 3 to Basaniya Road — more information requested, 5.8 km away
- Construction of Pondi Third PDS Bhawan to Ajgurh Approach Road — more information requested, 7 km away
- Proposed 2.48 MTPA Coal Washery Project by Mahavir Coal Resources Private… — cleared for impact study, 7.5 km away
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — forest land use approved, 7.5 km away
- L-164 Nyash Mod to Ajgudh Baiga Basti Under PMJANMAN — lapsed, 8.3 km away
- Parihasi Basemetal (Lead, Copper and Silver) Block — forest land use approved, 8.4 km away
- Gadariya Metal Stone Deposit — lapsed, 8.5 km away
More from Executive Engineer Pwd Div Singrauli in Singrauli
- Road From Chitrangi to Chitaval-Tamai-Jharkata-Barbadih (Ghoraval) to Uttar… — under wildlife review
- Road Mdr-12-01 Sihawal (Baghor-Bichhi) Khairpur to Bichhi Bagdara Gopla Padri… — under wildlife review
- Construction of Pondi Third PDS Bhawan to Ajgurh Approach Road — more information requested
- Strengthning for Pondi No 3 to Basaniya Road — more information requested
- Bharra to Redi Road Length 4.00 Km. — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.