Quick answers
What is this project?
Bharti Airtel Limited 5G OFC Project Sidhi_Singrauli_Pondi_Singrauli route (Van Vikas Nigam)DFO Sidhi west is an approved telecom project in Deosar, Singrauli, Madhya Pradesh. The site covers 1.3 acres.
Who is building it?
The applicant is Ramayan Bais.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 3 Jan 2025), as of 27 Nov 2026.
Where is it?
In Deosar, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹24 lakh; a site of 1.3 acres and 3,000 m² of forest land.
When was it filed?
The application was filed on 3 Dec 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 3 Jan 2025 |
| Application filed | 3 Dec 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Ramayan Bais |
| Land area | 1.3 acres (0.5 ha) |
| Forest land | 3,000 m² |
| Project cost | ₹24 lakh |
| Village / locality | Deosar |
| Taluk / tehsil | Deosar |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10903 |
In context
10 applications in Singrauli since January 2022 are in the same category (Telecom): 7 approved, 0 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 1.3 acres, this one is smaller than 70% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Deosar, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bharti Airtel Limited 5G OFC Project Sidhi_Singrauli_Pondi_Singrauli route DFO… — forest land use approved, 0 m away
- Jaghat Sand Quarry — environmental approval granted, 12.2 km away
- PTEMPL (MEL) Switchyard-Rewa (Sagra) 400kV DCDS line (Quad Moose) — forest land use approved, 14.8 km away
- Laua Stone Quarry Lease — lapsed, 17.7 km away
- ROW for 4G Saturation Project — forest land use approved, 17.9 km away
- Package No. MP50PMJM22 road from Khanduli Kusedi to Bandha road — initial checks, 17.9 km away
- Mahan– Rewa PS 400 KV D/c transmission line — more information requested, 19.1 km away
- Mahan– Rewa PS 400 KV D/c transmission line — more information requested, 19.1 km away
More from Ramayan Bais in Singrauli
- Bharti Airtel Limited 5G OFC Project Sidhi_Singrauli_Pondi_Singrauli route DFO… — forest land use approved
- Bharti Airtel Ltd. 5G OFC Project Majholi-Bilongi route DFO Singrouli — forest land use approved
- Bharti Airtel Ltd. 5G OFC Project Majholi-Bilongi route DFO Singrouli — lapsed
- Bharti Airtel Ltd. 5G OFC Project Majholi-Bilongi route DFO Sidhi west — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.