Upgradation With 2l+ps of Sendhwa to Khetia (Mp-Mh Border) From Km 0.000 to Km. 55.600, Total Length 55.60 Km Section of National Highway 752-G for Forest Land Diversion.

Upgradation With 2l+ps of Sendhwa to Khetia (Mp-Mh Border) From Km 0.000 to Km. 55.600, Total Length 55.60 Km Section of National Highway 752-G for Forest Land Diversion is a proposed road project in Sildhar, Niwali, Barwani, Madhya Pradesh. The site covers 375.7 acres. Its stated project cost is ₹660 crore. As of 27 Nov 2026, its status is “More information requested” (since 18 Nov 2026).

See it on the live map All projects in Barwani

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Upgradation With 2l+ps of Sendhwa to Khetia (Mp-Mh Border) From Km 0.000 to Km. 55.600, Total Length 55.60 Km Section of National Highway 752-G for Forest Land Diversion is a proposed road project in Sildhar, Niwali, Barwani, Madhya Pradesh. The site covers 375.7 acres.

Who is building it?

The applicant is Ministry of Road Transport & Highways.

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Sildhar, Niwali, Barwani, Madhya Pradesh.

How big is it?

It has a stated cost of ₹660 crore; a site of 375.7 acres and 52.9 acres (21.4 ha) of forest land.

When was it filed?

The application was filed on 17 Apr 2025.

Project details

StatusMore information requested
Status since18 Nov 2026
Application filed17 Apr 2025
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantMinistry of Road Transport & Highways
Land area375.7 acres (152 ha)
Forest land52.9 acres (21.4 ha)
Project cost₹660 crore
Village / localitySildhar
Taluk / tehsilNiwali
DistrictBarwani
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-10284

In context

17 applications in Barwani since January 2022 are in the same category (Roads & highways): 9 approved, 1 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 20 months from filing to approval. At 375.7 acres, this one is larger than 82% of them.

Where it is

Sildhar, Niwali, Barwani, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.