Quick answers
What is this project?
Upgradation With 2l+ps of Sendhwa to Khetia (Mp-Mh Border) From Km 0.000 to Km. 55.600, Total Length 55.60 Km Section of National Highway 752-G for Forest Land Diversion is a proposed road project in Sildhar, Niwali, Barwani, Madhya Pradesh. The site covers 375.7 acres.
Who is building it?
The applicant is Ministry of Road Transport & Highways.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Sildhar, Niwali, Barwani, Madhya Pradesh.
How big is it?
It has a stated cost of ₹660 crore; a site of 375.7 acres and 52.9 acres (21.4 ha) of forest land.
When was it filed?
The application was filed on 17 Apr 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 18 Nov 2026 |
| Application filed | 17 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Ministry of Road Transport & Highways |
| Land area | 375.7 acres (152 ha) |
| Forest land | 52.9 acres (21.4 ha) |
| Project cost | ₹660 crore |
| Village / locality | Sildhar |
| Taluk / tehsil | Niwali |
| District | Barwani |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10284 |
In context
17 applications in Barwani since January 2022 are in the same category (Roads & highways): 9 approved, 1 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 20 months from filing to approval. At 375.7 acres, this one is larger than 82% of them.
Where it is
Sildhar, Niwali, Barwani, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Moyada Stone Quarry — lapsed, 7.2 km away
- Kalamba Tank — under forest review, 8.3 km away
- Dondwada Stone Quarry — environmental approval granted, 10.1 km away
- Dondwada Stone Quarry — under environmental review, 10.4 km away
- Mansur Stone Quarry — lapsed, 12.4 km away
- Mansur Stone Quarry — lapsed, 12.4 km away
- Baljhiri Stone Quarry — initial checks, 16.5 km away
- Baljhiri Stone Quarry — environmental approval granted, 16.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.