Quick answers
What is Work of 33 KV Line for New 33/11 KV Substation?
Work of 33 KV Line for New 33/11 KV Substation is an approved power project in Nigwani, Kotma, Anuppur, Madhya Pradesh. The site covers 84.6 acres.
Who is building it?
The applicant is Rural Development.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 11 Jun 2026), as of 27 Nov 2026.
Where is it?
In Nigwani, Kotma, Anuppur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹43 lakh; a site of 84.6 acres and 6.1 acres (2.5 ha) of forest land.
When was it filed?
The application was filed on 23 Dec 2024.
Project details
| Official title | Work of 33 KV Line for New 33/11 KV Substation at village Kothi, Block Kotma under RDS Scheme. |
|---|---|
| Status | Forest land use approved |
| Status since | 11 Jun 2026 |
| Application filed | 23 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Rural Development |
| Land area | 84.6 acres (34.2 ha) |
| Forest land | 6.1 acres (2.5 ha) |
| Project cost | ₹43 lakh |
| Village / locality | Nigwani |
| Taluk / tehsil | Kotma |
| District | Anuppur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10369 |
In context
34 applications in Anuppur since January 2022 are in the same category (Power): 13 approved, 7 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 84.6 acres, this one is smaller than 61% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nigwani, Kotma, Anuppur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Work of 33 KV Line for New 33/11 KV Substation — lapsed, 2.9 km away
- Water Intake Facilities including underground Water Pipeline, Anicuts and… — under forest review, 3.7 km away
- Dongariya Khurd Stone Quarry — under environmental review, 3.8 km away
- Obtaining Environment Clearance for 1.008 Ha Dongaria Khurd Stone Quarry Lease… — under environmental review, 4 km away
- Dongaria Khurd Stone Mine — lapsed, 4 km away
- Dongariya Khurd Stone Quarry — lapsed, 4 km away
- Dongariya Khurd Stone Quarry — lapsed, 4 km away
- Dogariya Khurd Stone Quarry — under environmental review, 4.2 km away
More from Rural Development in Anuppur
- Bifurcation of 33 KV Kotma old feeder from 132 KV EHV S/S to 33/11 KV S/S… — lapsed
- Bifurcation of 33 KV Feeder from 132 KV EHV S/S to 33/11 KV S/S Funga — forest land use approved
- Electrification work of PVTG Habitation Village Akua, Census code-501932 — lapsed
- Stringing of additional 33 KV Line from 33/11 KV S/S Funga to Pasla Village — forest land use approved
- Electrification Work in Neelkanth Ashram at Village Miriya — lapsed
- Bifurcation of 33 KV Feeder from 33/11 KV S/S Parasi to 33/11 KV S/S Jaithari — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.