Quick answers
What is this project?
Water Intake Facilities including underground Water Pipeline, Anicuts and associate infrastructure for drawl of water from Sone River to Anuppur TPP Project site is a proposed pipeline project in Pasan, Anuppur, Madhya Pradesh. The site covers 2,285.7 acres.
Who is building it?
The applicant is Adani Power Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Pasan, Anuppur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹275 crore; a site of 2,285.7 acres and 57.4 acres (23.2 ha) of forest land.
When was it filed?
The application was filed on 3 Jul 2026.
Project details
| Official title | Construction of Water Intake Facilities including underground Water Pipeline, Anicuts and associate infrastructure for drawl of water from Sone River to Anuppur TPP Project site at Chhatai Village in Kotma Tehsil, Anuppur District, Madhya Pradesh by Anuppur Thermal Energy (MP) Pvt. Ltd. |
|---|---|
| Status | Under forest review |
| Status since | 8 Jul 2026 |
| Application filed | 3 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Adani Power Limited |
| Land area | 2,285.7 acres (925 ha) |
| Forest land | 57.4 acres (23.2 ha) |
| Project cost | ₹275 crore |
| Village / locality | Pasan |
| Taluk / tehsil | Anuppur |
| District | Anuppur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10692 |
In context
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pasan, Anuppur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Railway Siding From Baihatola Station to Anuppur TPP Project site by… — under forest review, 2 km away
- Residential Township of Anuppur Thermal Power Plant — under environmental review, 3.5 km away
- Proposed 4x800 MW Coal Based Ultra Super Critical Thermal Power Plant (USCTPP)… — environmental approval granted, 3.5 km away
- Proposed 4x800 MW Coal Based Ultra Super Critical Thermal Power Plant (USCTPP)… — cleared for impact study, 3.5 km away
- Work of 33 KV Line for New 33/11 KV Substation — forest land use approved, 3.7 km away
- Chhatai Sand Quarry (4.500 Ha.) — lapsed, 5.5 km away
- Work of 33 KV Line for New 33/11 KV Substation — lapsed, 5.7 km away
- Pathraudi Boulder, Gitti and Murrum Quarry — lapsed, 6.1 km away
More from Adani Power Limited in Anuppur
- Residential Township of Anuppur Thermal Power Plant — under environmental review
- Proposed Railway Siding From Baihatola Station to Anuppur TPP Project site by… — under forest review
- Approach Road for Intake Water Pump House facility for proposed Anuppur… — forest land use approved
- Proposed 4x800 MW Coal Based Ultra Super Critical Thermal Power Plant (USCTPP)… — environmental approval granted
- Proposed 4x800 MW Coal Based Ultra Super Critical Thermal Power Plant (USCTPP)… — cleared for impact study
6 Adani Power projects in Anuppur
All 68 Adani Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.