What is Developing? Open the mapMap

LapsedOther · Singrauli, Madhya Pradesh

Dhirauli North Coal Block

Dhirauli North Coal Block is a lapsed project in Bhalyatola, Singrauli, Madhya Pradesh. The site covers 2,337.6 acres. Its stated project cost is ₹3.5 crore. As of 27 Nov 2026, its status is “Lapsed” (since 4 Mar 2025).

See it on the live map All projects in Singrauli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Dhirauli North Coal Block?

Dhirauli North Coal Block is a lapsed project in Bhalyatola, Singrauli, Madhya Pradesh. The site covers 2,337.6 acres.

Who is building it?

The applicant is Central Mine Planning and Design Institute Limited.

Has it been approved?

No. The application was lapsed on 4 Mar 2025, so it is no longer under consideration.

Where is it?

In Bhalyatola, Singrauli, Madhya Pradesh.

How big is it?

It has a stated cost of ₹3.5 crore; a site of 2,337.6 acres and 823.3 acres (333.2 ha) of forest land.

When was it filed?

The application was filed on 23 Feb 2025.

Project details

StatusLapsed
Status since4 Mar 2025
Application filed23 Feb 2025
Approval soughtForest land use
Application typeNew project
SectorOther
ApplicantCentral Mine Planning and Design Institute Limited
Land area2,337.6 acres (946 ha)
Forest land823.3 acres (333.2 ha)
Project cost₹3.5 crore
Village / localityBhalyatola
Taluk / tehsilSingrauli
DistrictSingrauli
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-10005

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 23 Feb 2025 (this page)Lapsed2,337.6 acres₹3.5 crore
New project filed 29 Jan 2024Lapsed2,337.6 acres₹3.5 crore

In context

39 applications in Singrauli since January 2022 are in the same category (Other): 17 approved, 12 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 34 days from filing to approval. At 2,337.6 acres, this one is smaller than 67% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bhalyatola, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Central Mine Planning and Design Institute Limited in Singrauli

21 Central Mine Planning projects in Singrauli
All 58 Central Mine Planning projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.