What is this project?
Ridiversion of 1.7827 Ha of Forest Land for Laying of Water Pipe Line and Construction of Upper Rest House is a proposed project in Chachai Abad, Anuppur, Madhya Pradesh. The site covers 10.8 acres.
Who is building it?
The applicant is Chief Engineer (Generation) Atps, Mppgcl Chachai.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Chachai Abad, Anuppur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹3 crore; a site of 10.8 acres and 4.4 acres (1.8 ha) of forest land.
When was it filed?
The application was filed on 11 Aug 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 26 Nov 2026 |
| Application filed | 11 Aug 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Other |
| Applicant | Chief Engineer (Generation) Atps, Mppgcl Chachai |
| Land area | 10.8 acres (4.4 ha) |
| Forest land | 4.4 acres (1.8 ha) |
| Project cost | ₹3 crore |
| Village / locality | Chachai Abad |
| Taluk / tehsil | Anuppur |
| District | Anuppur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10461 |
In context
10 applications in Anuppur since January 2022 are in the same category (Other): 4 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected. At 10.8 acres, this one is smaller than 80% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chachai Abad, Anuppur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Chachai Aabad Sand Mine — environmental approval granted, 1.2 km away
- 5MW Solar Plant, Vivek Nagar Closed Underground Mine, SECL, Sohagpur Area. — more information requested, 2.4 km away
- 1x660 MW Amarkantak Ultra Supercritical Thermal Power Project — withdrawn, 2.5 km away
- 1x660 MW Amarkantak Ultra Supercritical Thermal Power Project — environmental approval granted, 2.5 km away
- 1x660 MW Amarkantak Ultra Supercritical Thermal Power Project — returned to applicant, 2.5 km away
- 1x210 MW Amarkantak Thermal Power Station — lapsed, 2.5 km away
- Manpur Sand Mine — not approved, 3.5 km away
- Manpur Sand Mine — cleared for impact study, 3.5 km away
More from Chief Engineer (Generation) Atps, Mppgcl Chachai in Anuppur
- Wall Around Sangma Railway Siding to Protect Green Forest From Pollution… — under forest review
- Construction of 1x660 MW Super Critical Thermal Power Plant — forest land use approved
- Construction of 1x660 MW Super Critical Thermal Power Plant. — lapsed
About this information