Quick answers
What is this project?
PTEMPL (MEL) Switchyard-Rewa (Sagra) 400kV DCDS line (Quad Moose) is an approved power project in Kanhaiyadah, Deosar, Singrauli, Madhya Pradesh. The site covers 6,628.5 acres.
Who is building it?
The applicant is AESL Projects Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 23 Nov 2026), as of 27 Nov 2026.
Where is it?
In Kanhaiyadah, Deosar, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹396.1 crore; a site of 6,628.5 acres and 524.3 acres (212.2 ha) of forest land.
When was it filed?
The application was filed on 4 Apr 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 23 Nov 2026 |
| Application filed | 4 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | AESL Projects Limited |
| Land area | 6,628.5 acres (2,682.5 ha) |
| Forest land | 524.3 acres (212.2 ha) |
| Project cost | ₹396.1 crore |
| Village / locality | Kanhaiyadah |
| Taluk / tehsil | Deosar |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09889 |
In context
16 applications in Singrauli since January 2022 are in the same category (Power): 9 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 13 months from filing to approval. At 6,628.5 acres, this one is larger than 88% of them.
Where it is
Kanhaiyadah, Deosar, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bharti Airtel Limited 5G OFC Project Sidhi_Singrauli_Pondi_Singrauli route… — forest land use approved, 14.8 km away
- Bharti Airtel Limited 5G OFC Project Sidhi_Singrauli_Pondi_Singrauli route DFO… — forest land use approved, 14.8 km away
- Nigri Sand Deposit — under environmental review, 18.3 km away
- Nigri Sand Deposit — cleared for impact study, 18.3 km away
- Mahan– Rewa PS 400 KV D/c transmission line — more information requested, 21.5 km away
- Mahan– Rewa PS 400 KV D/c transmission line — more information requested, 21.5 km away
- Bharti Airtel Ltd. 5G OFC Project Majholi-Bilongi route DFO Sidhi west — forest land use approved, 24.7 km away
- Mining project by M/S Giriraj Stone Crusher, Partner - Shri Ashok Kumar Punia — lapsed, 24.8 km away
All 3 AESL Projects projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.