Quick answers
What is this project?
Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal Road Authority Kauliwada-Mehandiwada Route Dfo South Balaghat is a lapsed road project in Bagholi, Waraseoni, Balaghat, Madhya Pradesh. The site covers 1 acre.
Who is building it?
The applicant is Jio Digital Fibre Private LTD.
Has it been approved?
No. The application was lapsed on 5 May 2026, so it is no longer under consideration.
Where is it?
In Bagholi, Waraseoni, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹28 lakh and a site of 1 acre.
When was it filed?
The application was filed on 5 Dec 2022.
Project details
| Status | Lapsed |
|---|---|
| Status since | 5 May 2026 |
| Application filed | 5 Dec 2022 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Jio Digital Fibre Private LTD |
| Land area | 4,000 m² |
| Project cost | ₹28 lakh |
| Village / locality | Bagholi |
| Taluk / tehsil | Waraseoni |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11100 |
In context
52 applications in Balaghat since January 2022 are in the same category (Roads & highways): 5 approved, 19 filed or under review, and 22 withdrawn, lapsed or rejected. The approved ones took a median of 2.2 years from filing to approval. At 1 acre, this one is smaller than 86% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bagholi, Waraseoni, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 200 KLPD Grain Based Distillery Plant with Product of RS/ENA with Bottling… — lapsed, 1.4 km away
- Expansion of Grain Base Fuel Ethanol Unit of 150 Klpd to 200 Klpd and 4 MW… — initial checks, 1.7 km away
- Transfer of Environment Clearance (EC) granted by MoEF&CC, New Delhi Vide EC… — under environmental review, 1.7 km away
- Basi Sand Quarry — environmental approval granted, 3.3 km away
- Capacity Expansion of Grain Based Fuel Ethanol Unit from 195 KLD to 345 KLD — lapsed, 3.6 km away
- Kauliwada Sand Quarry — environmental approval granted, 3.7 km away
- Kauliwada Sand Quarry — cleared for impact study, 3.7 km away
- Ansera Stione Quarry — withdrawn, 4.2 km away
More from Jio Digital Fibre Private LTD in Balaghat
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in RoW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in RoW Corridor of Principal… — more information requested
- Jio Digital Fiber Pvt Ltd OFC 5G Project in RoW Corridor of Principal… — lapsed
15 Jio Digital Fibre projects in Balaghat
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.