One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed 1,00,000 TPA green field Coal Tar Distillation Plant at Kalinganagar Industrial…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 21 Nov 2022 |
| Application filed | 21 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Vci Chemical Industries Private Limited |
| Land area | 22 acres (8.9 ha) |
| Project cost | ₹203.7 crore |
| Village / locality | Jakhapura |
| Taluk / tehsil | Jakhapura |
| District | Jajapur |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00049 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 3 Oct 2025 | Returned to applicant | 22 acres | ₹203.7 crore |
| New project filed 23 Mar 2024 | Environmental approval granted | 22 acres | ₹203.7 crore |
| Early planning filed 21 Nov 2022 (this page) | Cleared for impact study | 22 acres | ₹203.7 crore |
In context
56 applications in Jajapur since January 2022 are in the same category (Industry): 27 approved, 15 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 22 acres, this one is smaller than 89% of them.
39 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jakhapura, Jajapur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Tata Steel Plans a 10-Million-Tonne Expansion at Kalinganagar, Odisha (5.3 km away).
Other projects nearby
- Proposed 1,00,000 TPA green field Coal Tar Distillation Plant at Kalinganagar… — returned to applicant, 0 m away
- Greenfield project for Production of 500,000 TPA Rolled Products at… — lapsed, 400 m away
- Greenfield project for Production of 500,000 TPA Rolled Products at… — cleared for impact study, 400 m away
- Proposed 1,00,000 TPA green field Coal Tar Distillation Plant at Kalinganagar… — environmental approval granted, 650 m away
- Greenfield project for Production of 750,000 TPA Rolled Products at… — environmental approval granted, 750 m away
- Greenfield project for Production of 750,000 TPA Rolled Products at… — withdrawn, 750 m away
- Greenfield project for Production of 750,000 TPA Rolled Products at… — cleared for impact study, 750 m away
- Proposal of establishment of 1.5 MTPA of Cement Grinding Unit to Produce PSC,… — environmental approval granted, 1.2 km away
All 3 Vci Chemical Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.