Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 10 Jun 2023 |
| Application filed | 10 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Beekay Utkal Steel Private Limited |
| Land area | 64.9 acres (26.3 ha) |
| Project cost | ₹190 crore |
| Village / locality | Jakhapura |
| Taluk / tehsil | Jakhapura |
| District | Jajapur |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00383 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 May 2024 | Lapsed | 64.9 acres | ₹190 crore |
| Early planning filed 10 Jun 2023 (this page) | Cleared for impact study | 64.9 acres | ₹190 crore |
In context
56 applications in Jajapur since January 2022 are in the same category (Industry): 27 approved, 15 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 64.9 acres, this one is smaller than 61% of them.
37 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jakhapura, Jajapur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Tata Steel Plans a 10-Million-Tonne Expansion at Kalinganagar, Odisha (5.7 km away).
Other projects nearby
- Greenfield project for Production of 500,000 TPA Rolled Products at… — lapsed, 0 m away
- Proposed 1,00,000 TPA green field Coal Tar Distillation Plant at Kalinganagar… — returned to applicant, 400 m away
- Proposed 1,00,000 TPA green field Coal Tar Distillation Plant at Kalinganagar… — cleared for impact study, 400 m away
- Greenfield project for Production of 750,000 TPA Rolled Products at… — environmental approval granted, 600 m away
- Greenfield project for Production of 750,000 TPA Rolled Products at… — withdrawn, 600 m away
- Greenfield project for Production of 750,000 TPA Rolled Products at… — cleared for impact study, 600 m away
- Proposed 1,00,000 TPA green field Coal Tar Distillation Plant at Kalinganagar… — environmental approval granted, 800 m away
- Proposed Greenfield Coal Tar Distillation Unit of Capacity 2,00,000 TPA and… — environmental approval granted, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.