Quick answers
What is this project?
Dudolsingha Sand Cluster on IB river over cluster area of 19.43 Ha includes Dudolsingha Sand Bed- I over 4.86 ha, Dudolsingha Sand Bed- II over 4.86 ha , Dudolsingha Sand Bed- III over 4.86 ha and Dudolsingha Sand Quarry- D over 4.85 ha or 12.00 acres is a proposed mining project in Dudolsingha, Banaharapali, Jharsuguda, Odisha. The site covers 48 acres.
Who is building it?
The applicant is Biswakesan Pandey.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 9 Oct 2023), as of 27 Nov 2026.
Where is it?
In Dudolsingha, Banaharapali, Jharsuguda, Odisha.
How big is it?
It has a stated cost of ₹50 lakh and a site of 48 acres.
When was it filed?
The application was filed on 9 Oct 2023.
Project details
| Official title | Dudolsingha Sand Cluster on IB river over cluster area of 19.43 Ha includes Dudolsingha Sand Bed- I over 4.86 ha, Dudolsingha Sand Bed- II over 4.86 ha , Dudolsingha Sand Bed- III over 4.86 ha and Dudolsingha Sand Quarry- D over 4.85 ha or 12.00 acres in village Dudolsingha under Dalagaon Panchayat of Lakhanpur Tahasil of Jharsuguda District, Odisha. |
|---|---|
| Status | Cleared for impact study |
| Status since | 9 Oct 2023 |
| Application filed | 9 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Biswakesan Pandey |
| Land area | 48 acres (19.4 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Dudolsingha |
| Taluk / tehsil | Banaharapali |
| District | Jharsuguda |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00092 |
In context
80 applications in Jharsuguda since January 2022 are in the same category (Mining): 49 approved, 9 filed or under review, and 22 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 48 acres, this one is larger than 68% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 60 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Dudolsingha, Banaharapali, Jharsuguda, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Talabira II & III: A 23-Million-Tonne-a-Year Coal Mine for Jharsuguda and Sambalpur, Odisha (3.2 km away).
Other projects nearby
- Dudolsingha Sand Bed-III, covering 4.86 hectares (12.00 Acre) (Cluster… — under environmental review, 150 m away
- "Proposed Integrated Carbon Complex having 1. Coal Tar Distillation (CTD) Unit… — environmental approval granted, 2.7 km away
- Talabira II & III Opencast Coal Mine — environmental approval granted, 3.2 km away
- Talabira II & III Open Cast Mine — returned to applicant, 3.2 km away
- Grant of Ec of Sarandamal Stone Quarry-2 Over an Area 1.39 Acres Or 0.56… — environmental approval granted, 3.7 km away
- Transmission Towers for Connectivity From Ind Barath Energy Plant to Lilo for… — lapsed, 4.2 km away
- Environmental Clearance for production of country liquor from the… — under environmental review, 5.6 km away
- District Survey Report(DSR) of Road metal/ Building stone minor mineral of… — environmental approval granted, 5.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.