What is Developing? Open the mapMap

LapsedPower · Jharsuguda, Odisha

Transmission Towers for Connectivity From Ind Barath Energy Plant to Lilo for Power Evacuation Thorough Transmission Lines to Ists Network

Transmission Towers for Connectivity From Ind Barath Energy Plant to Lilo for Power Evacuation Thorough Transmission Lines to Ists Network is a lapsed power project in Barap>Li, Banaharapali, Jharsuguda, Odisha. The site covers 150.6 acres. Its stated project cost is ₹320 crore. As of 27 Nov 2026, its status is “Lapsed” (since 3 Apr 2024).

See it on the live map All projects in Jharsuguda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Transmission Towers for Connectivity From Ind Barath Energy Plant to Lilo for Power Evacuation Thorough Transmission Lines to Ists Network is a lapsed power project in Barap>Li, Banaharapali, Jharsuguda, Odisha. The site covers 150.6 acres.

Who is building it?

The applicant is Ind Barath Energy Utkal Limited.

Has it been approved?

No. The application was lapsed on 3 Apr 2024, so it is no longer under consideration.

Where is it?

In Barap>Li, Banaharapali, Jharsuguda, Odisha.

How big is it?

It has a stated cost of ₹320 crore; a site of 150.6 acres and 1.4 acres (0.6 ha) of forest land.

When was it filed?

The application was filed on 21 Dec 2023.

Project details

Official titleEstablishment of Transmission Towers for Connectivity From Ind Barath Energy Plant to Lilo for Power Evacuation Thorough Transmission Lines to Ists Network
StatusLapsed
Status since3 Apr 2024
Application filed21 Dec 2023
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantInd Barath Energy Utkal Limited
Land area150.6 acres (60.9 ha)
Forest land1.4 acres (0.6 ha)
Project cost₹320 crore
Village / localityBarap>Li
Taluk / tehsilBanaharapali
DistrictJharsuguda
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-04304

In context

19 applications in Jharsuguda since January 2022 are in the same category (Power): 8 approved, 8 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 150.6 acres, this one is smaller than 89% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Barap>Li, Banaharapali, Jharsuguda, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Talabira II & III: A 23-Million-Tonne-a-Year Coal Mine for Jharsuguda and Sambalpur, Odisha (7.3 km away).

Other projects nearby

More from Ind Barath Energy Utkal Limited in Jharsuguda

All 11 Ind Barath Energy Utkal projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.