Quick answers
What is this project?
"Proposed Integrated Carbon Complex having 1. Coal Tar Distillation (CTD) Unit having capacity 500,000 TPA 2. Coal Tar Value Added (CTVA) Unit having capacity 400,000 TPA 3. Continuous Zero QI (CZQ) Unit having capacity 150,000 TPA 4. Carbon Black (CB) Unit having capacity 300,000 TPA 5. 54 MW Captive Power Plant (CPP) 6. Synthetic Graphite Anode (SGA)Unit having capacity 100,000 TPA and 7. Natural Graphite Anode (NGA)Unit having capacity 25,000 TPA" is an approved industrial project in Shreepura, Badmal, Jharsuguda, Odisha. The site covers 595.7 acres.
Who is building it?
The applicant is Epsilon Carbon Ashoka Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 Mar 2024), as of 27 Nov 2026.
Where is it?
In Shreepura, Badmal, Jharsuguda, Odisha.
How big is it?
It has a stated cost of ₹900 crore and a site of 595.7 acres.
When was it filed?
The application was filed on 2 Aug 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Mar 2024 |
| Application filed | 2 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Epsilon Carbon Ashoka Private Limited |
| Land area | 595.7 acres (241.1 ha) |
| Project cost | ₹900 crore |
| Village / locality | Shreepura |
| Taluk / tehsil | Badmal |
| District | Jharsuguda |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00255 |
In context
38 applications in Jharsuguda since January 2022 are in the same category (Industry): 23 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 595.7 acres, this one is larger than 89% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Shreepura, Badmal, Jharsuguda, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Talabira II & III: A 23-Million-Tonne-a-Year Coal Mine for Jharsuguda and Sambalpur, Odisha (1.3 km away).
Other projects nearby
- Talabira II & III Opencast Coal Mine — environmental approval granted, 1.3 km away
- Talabira II & III Open Cast Mine — returned to applicant, 1.3 km away
- Dudolsingha Sand Bed-III, covering 4.86 hectares (12.00 Acre) (Cluster… — under environmental review, 2.7 km away
- Dudolsingha Sand Cluster on IB river over cluster area of 19.43 Ha includes… — cleared for impact study, 2.7 km away
- District Survey Report(DSR) of Road metal/ Building stone minor mineral of… — environmental approval granted, 3.4 km away
- Submission of District Survey Report(Dsr) for Minor Minerals I.E Sand, Stone… — returned to applicant, 3.4 km away
- 1X800MW NLC Talabira Thermal Power Project (NTTPP) Phase-II — cleared for impact study, 3.5 km away
- Proposed Integrated Steel Plant of 0.528 MTPA Crude Steel in 103.581 Ha — cleared for impact study, 4.4 km away
More from Epsilon Carbon Ashoka Private Limited in Jharsuguda
- Forest Diversion Proposal over 4.0834 ha. Forest Land for construction of… — in-principle approval, conditions pending
All 3 Epsilon Carbon Ashoka projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.