Quick answers
What is this project?
Greenfield Ferro alloys Plant for production of 52400TPA(Max) Ferro Alloys through 2x9MVA SAF or 35000TPA(max) LC/MC Ferro alloys through 2x3.6MVA EAF 1x10Ton LRF 1x10Ton VOD 1x10Ton AOD, 12000TPA Noble Ferro Alloys by Alumino Thermite process 75000TPA High Alumino Refractory Material, 15000TPA Mn & Fine dust Pellet, 3500Nm3/hr Producer Gas, 86400TPA Cr Ore Briquettes and 10TPH Jigging Plant at Sarua Industrial Estate, Sarua village, dist-Khordha, Odisha by Indiano SPL Pvt Ltd is a proposed industrial project in Sarua, Khordha, Odisha. The site covers 9.2 acres.
Who is building it?
The applicant is Indiano Spl Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 18 Dec 2023), as of 27 Nov 2026.
Where is it?
In Sarua, Khordha, Odisha.
How big is it?
It has a stated cost of ₹99.7 crore and a site of 9.2 acres.
When was it filed?
The application was filed on 9 Nov 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield Ferro alloys Plant for production of 52400TPA(Max) Ferro Alloys through…
Project details
| Official title | Establishment of Greenfield Ferro alloys Plant for production of 52400TPA(Max) Ferro Alloys through 2x9MVA SAF or 35000TPA(max) LC/MC Ferro alloys through 2x3.6MVA EAF 1x10Ton LRF 1x10Ton VOD 1x10Ton AOD, 12000TPA Noble Ferro Alloys by Alumino Thermite process 75000TPA High Alumino Refractory Material, 15000TPA Mn & Fine dust Pellet, 3500Nm3/hr Producer Gas, 86400TPA Cr Ore Briquettes and 10TPH Jigging Plant at Sarua Industrial Estate, Sarua village, dist-Khordha, Odisha by Indiano SPL Pvt Ltd |
|---|---|
| Status | Cleared for impact study |
| Status since | 18 Dec 2023 |
| Application filed | 9 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Indiano Spl Private Limited |
| Land area | 9.2 acres (3.7 ha) |
| Project cost | ₹99.7 crore |
| Village / locality | Sarua |
| Taluk / tehsil | Khordha |
| District | Khordha |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00229 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 9 Aug 2024 | Environmental approval granted | 9.2 acres | ₹99.7 crore |
| Early planning filed 9 Nov 2023 (this page) | Cleared for impact study | 9.2 acres | ₹99.7 crore |
In context
9 applications in Khordha since January 2022 are in the same category (Industry): 5 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarua, Khordha, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Ferro alloys Plant for production of 52400TPA(Max) Ferro Alloys… — environmental approval granted, 0 m away
- Merger of New Laxmi Steel & Power Pvt. Ltd. & New Laxmi Industry Pvt. Ltd.,… — more information requested, 300 m away
- Merger of New Laxmi Steel & Power Pvt. Ltd. & New Laxmi Industry Pvt. Ltd.,… — cleared for impact study, 300 m away
- New Six-lane Capital Region Ring Road from Rameswar (NH-16) to Gobindpur… — lapsed, 3.1 km away
- Proposed Industrial Building with Total Built-up Area of 72,711.61 Sq.m on a… — environmental approval granted, 5.3 km away
- Proposed Environment Clearance for Industrial Building Having Total Built Up… — lapsed, 5.8 km away
- Common Bio-Medical Waste Treatment Facilities expansion from 3.2 TPD to 11.2… — not approved, 7.6 km away
- Common Bio-Medical Waste Treatment Facilities expansion from 3.2 TPD to 11.2… — cleared for impact study, 7.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.