Merger of New Laxmi Steel & Power Pvt. Ltd. & New Laxmi Industry Pvt. Ltd., located adjacent at Jayamangala, Sarua, Khordha to form a single entity named as New Laxmi Steel & Power Pvt. Ltd. & Expansion of existing IF from 58,700 TPA (2 X 8 T + 1X10T) to final 4,45, 500 TPA (Replacement of existing 2 X 8T with new 2 X 25T, existing 1 x 10 T and new 3 x 25 T ) and No expansion of Existing 1,44,000 TPA Rolling mill, 1,20,000 TPA Structural mill & 29,000 TPA Galvanized Steel is a proposed industrial project in Sarua, Khordha, Odisha. The site covers 17.1 acres.
Who is building it?
The applicant is New Laxmi Steel & Power Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Sarua, Khordha, Odisha.
How big is it?
It has a stated cost of ₹69.5 crore and a site of 17.1 acres.
When was it filed?
The application was filed on 27 Nov 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Merger of New Laxmi Steel & Power Pvt. Ltd. & New Laxmi Industry Pvt. Ltd., located…
Project details
| Status | More information requested |
|---|---|
| Status since | 17 Nov 2026 |
| Application filed | 27 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | New Laxmi Steel & Power Private Limited |
| Land area | 17.1 acres (6.9 ha) |
| Project cost | ₹69.5 crore |
| Village / locality | Sarua |
| Taluk / tehsil | Khordha |
| District | Khordha |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02023 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 27 Nov 2025 (this page) | More information requested | 17.1 acres | ₹69.5 crore |
| Early planning filed 2 Feb 2024 | Cleared for impact study | 17.1 acres | ₹69.5 crore |
In context
9 applications in Khordha since January 2022 are in the same category (Industry): 5 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarua, Khordha, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Merger of New Laxmi Steel & Power Pvt. Ltd. & New Laxmi Industry Pvt. Ltd.,… — cleared for impact study, 0 m away
- Greenfield Ferro alloys Plant for production of 52400TPA(Max) Ferro Alloys… — environmental approval granted, 300 m away
- Greenfield Ferro alloys Plant for production of 52400TPA(Max) Ferro Alloys… — cleared for impact study, 300 m away
- New Six-lane Capital Region Ring Road from Rameswar (NH-16) to Gobindpur… — lapsed, 3.1 km away
- Proposed Industrial Building with Total Built-up Area of 72,711.61 Sq.m on a… — environmental approval granted, 5 km away
- Proposed Environment Clearance for Industrial Building Having Total Built Up… — lapsed, 5.5 km away
- Common Bio-Medical Waste Treatment Facilities expansion from 3.2 TPD to 11.2… — not approved, 7.3 km away
- Common Bio-Medical Waste Treatment Facilities expansion from 3.2 TPD to 11.2… — cleared for impact study, 7.3 km away