What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Khordha, Odisha

Proposed Industrial Building with Total Built-up Area of 72,711.61 Sq.m on a Plot Area of 40.80 Acres for Establishment of a Greenfield Project for Manufacturing of Forged and Machining Railway Wheels and Axles with an Annual Capacity of 2,20,000 Wheels, 75,000 Axles and assembly of 75000 wheelsets per annum at Mouza – Haladipada, Tehsil – Khordha, District – Khordha, Odisha by M/s Jupiter Tatravagonka Railwheel Factory Private Limited

Proposed Industrial Building with Total Built-up Area of 72,711.61 Sq.m on a Plot Area of 40.80 Acres for Establishment of a Greenfield Project for Manufacturing of Forged and Machining Railway Wheels and Axles with an Annual Capacity of 2,20,000 Wheels, 75,000 Axles and assembly of 75000 wheelsets per annum at Mouza – Haladipada, Tehsil – Khordha, District – Khordha, Odisha by M/s Jupiter Tatravagonka Railwheel Factory Private Limited is an approved industrial building project in Haladipada, Khordha, Odisha. The site covers 40.8 acres. Its stated project cost is ₹2,139.1 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 11 Sept 2025).

See it on the live map All projects in Khordha

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Industrial Building with Total Built-up Area of 72,711.61 Sq.m on a Plot Area of 40.80 Acres for Establishment of a Greenfield Project for Manufacturing of Forged and Machining Railway Wheels and Axles with an Annual Capacity of 2,20,000 Wheels, 75,000 Axles and assembly of 75000 wheelsets per annum at Mouza – Haladipada, Tehsil – Khordha, District – Khordha, Odisha by M/s Jupiter Tatravagonka Railwheel Factory Private Limited is an approved industrial building project in Haladipada, Khordha, Odisha. The site covers 40.8 acres.

Who is building it?

The applicant is Jupiter Tatravagonka Railwheel Factory Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 11 Sept 2025), as of 27 Nov 2026.

Where is it?

In Haladipada, Khordha, Odisha.

How big is it?

It has a stated cost of ₹2,139.1 crore and a site of 40.8 acres.

When was it filed?

The application was filed on 12 Jul 2025.

Project details

StatusEnvironmental approval granted
Status since11 Sept 2025
Application filed12 Jul 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantJupiter Tatravagonka Railwheel Factory Private Limited
UseIndustrial
Land area40.8 acres (16.5 ha)
Built-up area72,712 m² (7,82,665 sq ft)
Plot area1,65,111 m² (17,77,238 sq ft)
Project cost₹2,139.1 crore
Village / localityHaladipada
Taluk / tehsilKhordha
DistrictKhordha
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-02738

In context

167 applications in Khordha since January 2022 are in the same category (Buildings & townships): 103 approved, 31 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 40.8 acres, this one is larger than 92% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Haladipada, Khordha, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.