What is Developing? Open the mapMap

Cleared for impact studyMining · Kendujhar, Odisha

Proposed Iron Ore Beneficiation plant of capacity 9,60,000 TPA located Village Dubuna, Barbil, Dist- Keonjhar, State-Odisha for M/s High Grade Mineral Private Limited (HGMPL)

Proposed Iron Ore Beneficiation plant of capacity 9,60,000 TPA located Village Dubuna, Barbil, Dist- Keonjhar, State-Odisha for M/s High Grade Mineral Private Limited (HGMPL) is a proposed mining project in Dobuna, Bamebari, Kendujhar, Odisha. The site covers 2.4 acres. Its stated project cost is ₹46 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 8 Nov 2023).

See it on the live map All projects in Kendujhar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Iron Ore Beneficiation plant of capacity 9,60,000 TPA located Village Dubuna, Barbil, Dist- Keonjhar, State-Odisha for M/s High Grade Mineral Private Limited (HGMPL) is a proposed mining project in Dobuna, Bamebari, Kendujhar, Odisha. The site covers 2.4 acres.

Who is building it?

The applicant is High Grade Mineral Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 8 Nov 2023), as of 27 Nov 2026.

Where is it?

In Dobuna, Bamebari, Kendujhar, Odisha.

How big is it?

It has a stated cost of ₹46 crore and a site of 2.4 acres.

When was it filed?

The application was filed on 8 Nov 2023.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Iron Ore Beneficiation plant of capacity 9,60,000 TPA located Village Dubuna,…

Project details

StatusCleared for impact study
Status since8 Nov 2023
Application filed8 Nov 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantHigh Grade Mineral Private Limited
Land area2.4 acres (1 ha)
Project cost₹46 crore
Village / localityDobuna
Taluk / tehsilBamebari
DistrictKendujhar
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-00366

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 31 May 2025Environmental approval granted7 acres₹46 crore
Amendment filed 18 Jul 2024Cleared for impact study2.4 acres₹46 crore
Early planning filed 8 Nov 2023 (this page)Cleared for impact study2.4 acres₹46 crore

In context

213 applications in Kendujhar since January 2022 are in the same category (Mining): 110 approved, 46 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.4 acres, this one is smaller than 96% of them.

No other mining lease on record is within 500 m of this site; 13 have applied within 5 km.

Where it is

Dobuna, Bamebari, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 High Grade Mineral projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.