Quick answers
What is this project?
Diversion of 46.757 ha of forest land (including 2.721 ha Safety zone) in Jajang Iron Ore Block of M/s JSW Steel Ltd is a lapsed mining project in Bandhuabeda, Bamebari, Kendujhar, Odisha. The site covers 2,065.8 acres.
Who is building it?
The applicant is Jsw Steel LTD.
Has it been approved?
No. The application was lapsed on 22 May 2025, so it is no longer under consideration.
Where is it?
In Bandhuabeda, Bamebari, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹100 crore; a site of 2,065.8 acres and 115.5 acres (46.8 ha) of forest land.
When was it filed?
The application was filed on 28 Feb 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 22 May 2025 |
| Application filed | 28 Feb 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Jsw Steel LTD |
| Land area | 2,065.8 acres (836 ha) |
| Forest land | 115.5 acres (46.8 ha) |
| Project cost | ₹100 crore |
| Village / locality | Bandhuabeda |
| Taluk / tehsil | Bamebari |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04442 |
In context
213 applications in Kendujhar since January 2022 are in the same category (Mining): 110 approved, 46 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2,065.8 acres, this one is larger than 90% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 5,372.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.
Where it is
Bandhuabeda, Bamebari, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jajang Iron Ore mine of M/s JSW Steel Ltd for production of 12.80 MTPA (ROM)… — lapsed, 100 m away
- Jajang Iron Ore Mine (ML Area: 666.150 Ha: as per RoR /669.078 Ha: as per DGPS… — returned to applicant, 100 m away
- Proposed Iron Ore Beneficiation plant of capacity 9,60,000 TPA located Village… — cleared for impact study, 1.7 km away
- Proposed Iron Ore Beneficiation plant of capacity 9,60,000 TPA located Village… — cleared for impact study, 1.7 km away
- Proposed Iron Ore Beneficiation plant of capacity 9,60,000 TPA located Village… — environmental approval granted, 1.7 km away
- Transfer of EC of Jaribahal Iron Ore Mines — lapsed, 2.4 km away
- Jururi Iron Ore Mine — environmental approval granted, 3.8 km away
- Jilling Langalotta Iron Ore Mine — lapsed, 3.8 km away
More from Jsw Steel LTD in Kendujhar
- Diversion of forest land for non forest purpose in Nuagaon Iron Ore Mines of… — in-principle approval, conditions pending
- Nuagaon Iron Ore Mine for Production of 20 MTPA(ROM) of Iron ore with Total… — lapsed
- Diversion of Forest Land for non forest purpose for construction of 132 KV… — more information requested
- Jajang Iron Ore Mine (ML Area: 666.150 Ha: as per RoR /669.078 Ha: as per DGPS… — returned to applicant
- Exploration work in Nuagaon Iron Ore Block of M/s JSW Steel Ltd — lapsed
- Jajang Iron Ore mine of M/s JSW Steel Ltd for production of 12.80 MTPA (ROM)… — lapsed
7 Jsw Steel projects in Kendujhar
All 97 Jsw Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.