Quick answers
What is this project?
Proposed Iron Ore Beneficiation plant of capacity 9,60,000 TPA located Village Dubuna, Barbil, Dist- Keonjhar, State-Odisha for M/s High Grade Mineral Private Limited (HGMPL) is a proposed mining project in Dobuna, Bamebari, Kendujhar, Odisha. The site covers 2.4 acres.
Who is building it?
The applicant is High Grade Mineral Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 20 Nov 2024), as of 27 Nov 2026.
Where is it?
In Dobuna, Bamebari, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹46 crore and a site of 2.4 acres.
When was it filed?
The application was filed on 18 Jul 2024.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Iron Ore Beneficiation plant of capacity 9,60,000 TPA located Village Dubuna,…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 20 Nov 2024 |
| Application filed | 18 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | High Grade Mineral Private Limited |
| Land area | 2.4 acres (1 ha) |
| Project cost | ₹46 crore |
| Village / locality | Dobuna |
| Taluk / tehsil | Bamebari |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01484 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 May 2025 | Environmental approval granted | 7 acres | ₹46 crore |
| Amendment filed 18 Jul 2024 (this page) | Cleared for impact study | 2.4 acres | ₹46 crore |
| Early planning filed 8 Nov 2023 | Cleared for impact study | 2.4 acres | ₹46 crore |
In context
213 applications in Kendujhar since January 2022 are in the same category (Mining): 110 approved, 46 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.4 acres, this one is smaller than 96% of them.
No other mining lease on record is within 500 m of this site; 13 have applied within 5 km.
Where it is
Dobuna, Bamebari, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Iron Ore Beneficiation plant of capacity 9,60,000 TPA located Village… — cleared for impact study, 0 m away
- Proposed Iron Ore Beneficiation plant of capacity 9,60,000 TPA located Village… — environmental approval granted, 0 m away
- Diversion of 46.757 ha of forest land (including 2.721 ha Safety zone) in… — lapsed, 1.7 km away
- Jajang Iron Ore mine of M/s JSW Steel Ltd for production of 12.80 MTPA (ROM)… — lapsed, 1.7 km away
- Jajang Iron Ore Mine (ML Area: 666.150 Ha: as per RoR /669.078 Ha: as per DGPS… — returned to applicant, 1.7 km away
- Jururi Iron Ore Mine — environmental approval granted, 2.1 km away
- Jilling Langalotta Iron Ore Mine — lapsed, 2.5 km away
- Expansion of Jilling Langalotta Iron Ore Mine — lapsed, 2.5 km away
All 3 High Grade Mineral projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.