Pattiguda Stone Quarry Over an area of 9.125 acres or 3.692 ha is an approved mining project in Patigurha, Patapur, Ganjam, Odisha. The site covers 9.1 acres.
Who is building it?
The applicant is Santosh Bisoyi.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 Aug 2023), as of 27 Nov 2026.
Where is it?
In Patigurha, Patapur, Ganjam, Odisha.
How big is it?
It has a stated cost of ₹6.9 crore and a site of 9.1 acres.
When was it filed?
The application was filed on 24 Aug 2023.
Project details
| Official title | Pattiguda Stone Quarry Over an area of 9.125 acres or 3.692 ha at village Pattiguda Tahasil Sanakhemundi District Ganjam |
|---|---|
| Status | Environmental approval granted |
| Status since | 24 Aug 2023 |
| Application filed | 24 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Santosh Bisoyi |
| Land area | 9.1 acres (3.7 ha) |
| Project cost | ₹6.9 crore |
| Village / locality | Patigurha |
| Taluk / tehsil | Patapur |
| District | Ganjam |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00403 |
In context
235 applications in Ganjam since January 2022 are in the same category (Mining): 134 approved, 18 filed or under review, and 83 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 9.1 acres, this one is smaller than 61% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Patigurha, Patapur, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Nuagaon Brick Earth Quarry over an area of 1.585 acres or 0.6414 hectares… — environmental approval granted, 3 km away
- Fresh EC of Mohua Flower Based Country Liquor Manufacturing Unit, M/s.… — environmental approval granted, 3.4 km away
- Extension of Validity for Mahua Flower Based Country Liquour Manufacturing… — not approved, 3.4 km away
- Extension of Validity for Mahua Flower Based Country Liquour Manufacturing… — not approved, 3.4 km away
- Extension of Validity for Mahua Flower Based Country Liquour Manufacturing… — environmental approval granted, 3.4 km away
- Extension of Validity for Mahua Flower Based Country Liquour Manufacturing… — environmental approval granted, 3.4 km away
- Phasiguda Sand Quarry-1 over an area of 12.842 acres or 5.197 hectares bearing… — cleared for impact study, 8.3 km away
- Jalameripalli Sand Quarry over an area of 21.937 Acre or 8.8777 Hectares… — lapsed, 8.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.