Quick answers
What is this project?
Extension of Validity for Mahua Flower Based Country Liquour Manufacturing Unit,M/s. Podamari main out still liquour Shop at Podamari,Dist-Ganjam of Smt.Rebati Sahu is an approved industrial project in Pudamari, Patapur, Ganjam, Odisha. The site covers 0.8 acres.
Who is building it?
The applicant is Rebati Sahu.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 Aug 2025), as of 27 Nov 2026.
Where is it?
In Pudamari, Patapur, Ganjam, Odisha.
How big is it?
It has a stated cost of ₹30 lakh and a site of 0.8 acres.
When was it filed?
The application was filed on 6 Jul 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 18 Aug 2025 |
| Application filed | 6 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Industry |
| Applicant | Rebati Sahu |
| Land area | 3,400 m² |
| Project cost | ₹30 lakh |
| Village / locality | Pudamari |
| Taluk / tehsil | Patapur |
| District | Ganjam |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02002 |
All filings for this project
This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 17 Jul 2026 | Not approved | 0.8 acres | ₹30 lakh |
| Validity extension filed 27 Jun 2026 | Not approved | 0.8 acres | ₹30 lakh |
| Validity extension filed 6 Jul 2025 (this page) | Environmental approval granted | 0.8 acres | ₹30 lakh |
| Validity extension filed 2 Jan 2025 | Environmental approval granted | 0.8 acres | ₹30 lakh |
In context
188 applications in Ganjam since January 2022 are in the same category (Industry): 153 approved, 9 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.8 acres, this one is larger than 76% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pudamari, Patapur, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Fresh EC of Mohua Flower Based Country Liquor Manufacturing Unit, M/s.… — environmental approval granted, 0 m away
- Extension of Validity for Mahua Flower Based Country Liquour Manufacturing… — not approved, 0 m away
- Extension of Validity for Mahua Flower Based Country Liquour Manufacturing… — not approved, 0 m away
- Extension of Validity for Mahua Flower Based Country Liquour Manufacturing… — environmental approval granted, 0 m away
- Nuagaon Brick Earth Quarry over an area of 1.585 acres or 0.6414 hectares… — environmental approval granted, 1.3 km away
- Pattiguda Stone Quarry Over an area of 9.125 acres or 3.692 ha — environmental approval granted, 3.4 km away
- Phasiguda Sand Quarry-1 over an area of 12.842 acres or 5.197 hectares bearing… — cleared for impact study, 7.4 km away
- Jalameripalli Sand Quarry over an area of 21.937 Acre or 8.8777 Hectares… — lapsed, 7.9 km away
More from Rebati Sahu in Ganjam
- Fresh EC of Mohua Flower Based Country Liquor Manufacturing Unit, M/s.… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.