What is Developing? Open the mapMap

Environmental approval grantedIndustry · Ganjam, Odisha

Fresh EC of Mohua Flower Based Country Liquor Manufacturing Unit, M/s. Podamari Main Out Still Liquor Shop at Podamari, Dist-Ganjam of Smt. Rebati Sahu

Fresh EC of Mohua Flower Based Country Liquor Manufacturing Unit, M/s. Podamari Main Out Still Liquor Shop at Podamari, Dist-Ganjam of Smt. Rebati Sahu is an approved industrial project in Pudamari, Patapur, Ganjam, Odisha. The site covers 0.9 acres. Its stated project cost is ₹30 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 20 Nov 2026).

See it on the live map All projects in Ganjam

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Fresh EC of Mohua Flower Based Country Liquor Manufacturing Unit, M/s. Podamari Main Out Still Liquor Shop at Podamari, Dist-Ganjam of Smt. Rebati Sahu is an approved industrial project in Pudamari, Patapur, Ganjam, Odisha. The site covers 0.9 acres.

Who is building it?

The applicant is Rebati Sahu.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 20 Nov 2026), as of 27 Nov 2026.

Where is it?

In Pudamari, Patapur, Ganjam, Odisha.

How big is it?

It has a stated cost of ₹30 lakh and a site of 0.9 acres.

When was it filed?

The application was filed on 20 Aug 2026.

Project details

Official titleProposal for fresh EC of Mohua Flower Based Country Liquor Manufacturing Unit, M/s. Podamari Main Out Still Liquor Shop at Podamari, Dist-Ganjam of Smt. Rebati Sahu
StatusEnvironmental approval granted
Status since20 Nov 2026
Application filed20 Aug 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantRebati Sahu
Land area3,700 m²
Project cost₹30 lakh
Village / localityPudamari
Taluk / tehsilPatapur
DistrictGanjam
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-03652

In context

188 applications in Ganjam since January 2022 are in the same category (Industry): 153 approved, 9 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.9 acres, this one is larger than 82% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Pudamari, Patapur, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Rebati Sahu in Ganjam

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.