Quick answers
What is Industrial project by M/s. Infrastructure Unit Two?
This proposed industrial project by M/s. Infrastructure Unit Two is in Jh>Rsuguda Town, Jharsuguda, Odisha. The site covers 0.9 acres.
Who is building it?
The applicant is Arun Mundra.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 18 Apr 2024), as of 27 Nov 2026.
Where is it?
In Jh>Rsuguda Town, Jharsuguda, Odisha.
How big is it?
It has a stated cost of ₹2.8 crore and a site of 0.9 acres.
When was it filed?
The application was filed on 2 Feb 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 18 Apr 2024 |
| Application filed | 2 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Arun Mundra |
| Land area | 3,500 m² |
| Project cost | ₹2.8 crore |
| Village / locality | Jh>Rsuguda Town |
| Taluk / tehsil | Jharsuguda |
| District | Jharsuguda |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00517 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 Aug 2026 | More information requested | 0.9 acres | ₹2.8 crore |
| Early planning filed 2 Feb 2024 (this page) | Cleared for impact study | 0.9 acres | ₹2.8 crore |
In context
38 applications in Jharsuguda since January 2022 are in the same category (Industry): 23 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.9 acres, this one is smaller than 86% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jh>Rsuguda Town, Jharsuguda, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Talabira II & III: A 23-Million-Tonne-a-Year Coal Mine for Jharsuguda and Sambalpur, Odisha (13.6 km away).
Other projects nearby
- Industrial project by M/s. Infrastructure Unit Two — more information requested, 0 m away
- Cement Grinding Unit of Capacity 15000 Tonne Per Annum Located in Industrial… — returned to applicant, 0 m away
- Expansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished… — environmental approval granted, 2.2 km away
- Expansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished… — cleared for impact study, 2.2 km away
- Change in configuration of Integrated Steel Plant from 2x0.6 MTPA… — initial checks, 3.3 km away
- Proposed for Change in configuration and production capacity from SMS of… — initial checks, 3.3 km away
- Transfer of Environment Clearance (EC) w.r.t Expansion of Integrated Steel… — environmental approval granted, 3.3 km away
- Environment Clearance for Integrated Steel Plant with Pelletization Plant (2 x… — cleared for impact study, 3.3 km away
More from Arun Mundra in Jharsuguda
- Cement Grinding Unit of Capacity 15000 Tonne Per Annum Located in Industrial… — returned to applicant
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.