What is Developing? Open the mapMap

Cleared for impact studyPower · Anugul, Odisha

2 x 525 MW Coal Based Thermal Power Plant

2 x 525 MW Coal Based Thermal Power Plant is a proposed power project in Balichandrapur, Industrial, Anugul, Odisha. The site covers 988.4 acres. Its stated project cost is ₹57.6 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 13 Jun 2023).

See it on the live map All projects in Anugul

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is 2 x 525 MW Coal Based Thermal Power Plant?

2 x 525 MW Coal Based Thermal Power Plant is a proposed power project in Balichandrapur, Industrial, Anugul, Odisha. The site covers 988.4 acres.

Who is building it?

The applicant is Jindal Steel Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 13 Jun 2023), as of 27 Nov 2026.

Where is it?

In Balichandrapur, Industrial, Anugul, Odisha.

How big is it?

It has a stated cost of ₹57.6 crore and a site of 988.4 acres.

When was it filed?

The application was filed on 13 Apr 2023.

One of 3 filings for this project. The project's main page, with every filing and where each stands: 2 x 525 MW Coal Based Thermal Power Plant

Project details

Official title2 x 525 MW Coal Based Thermal Power Plant at village Malibrahamani in Chhendipada Block, Dist. Angul, Odisha
StatusCleared for impact study
Status since13 Jun 2023
Application filed13 Apr 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorPower
ApplicantJindal Steel Limited
Land area988.4 acres (400 ha)
Project cost₹57.6 crore
Village / localityBalichandrapur
Taluk / tehsilIndustrial
DistrictAnugul
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-00526

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Ownership transfer filed 26 Dec 2025Environmental approval granted988.4 acres₹57.6 crore
New project filed 28 Jan 2024Environmental approval granted988.4 acres₹57.6 crore
Early planning filed 13 Apr 2023 (this page)Cleared for impact study988.4 acres₹57.6 crore

In context

17 applications in Anugul since January 2022 are in the same category (Power): 7 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 988.4 acres, this one is larger than 63% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Balichandrapur, Industrial, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jindal Steel Limited in Anugul

18 Jindal Steel projects in Anugul
All 39 Jindal Steel projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.