What is Coal washery with capacity of 5 MTPA?
Coal washery with capacity of 5 MTPA is an approved mining project in Malimalibrahmani, Industrial, Anugul, Odisha. The site covers 30 acres.
Who is building it?
The applicant is Jindal Steel Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 Jan 2026), as of 27 Nov 2026.
Where is it?
In Malimalibrahmani, Industrial, Anugul, Odisha.
How big is it?
It has a stated cost of ₹68 crore and a site of 30 acres.
When was it filed?
The application was filed on 28 Oct 2025.
Project details
| Official title | Coal washery with capacity of 5 MTPA located at village Malibrahmani, Tehsil- Chhendipada, District- Angul, Odisha |
|---|---|
| Status | Environmental approval granted |
| Status since | 6 Jan 2026 |
| Application filed | 28 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Jindal Steel Limited |
| Land area | 30 acres (12.1 ha) |
| Project cost | ₹68 crore |
| Village / locality | Malimalibrahmani |
| Taluk / tehsil | Industrial |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02359 |
In context
108 applications in Anugul since January 2022 are in the same category (Mining): 50 approved, 25 filed or under review, and 33 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 30 acres, this one is smaller than 62% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Malimalibrahmani, Industrial, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment in Environmental Clearance of 2x525 MW coal based Thermal Power Plant — returned to applicant, 1.8 km away
- Expansion of existing 2x525 MW by addition of 2x800 MW coal based Thermal… — returned to applicant, 2 km away
- 2 x 525 MW Coal Based Thermal Power Plant — environmental approval granted, 2 km away
- 2 x 525 MW Coal Based Thermal Power Plant — environmental approval granted, 2 km away
- 2 x 525 MW Coal Based Thermal Power Plant — cleared for impact study, 2 km away
- Coal Washery (6.5 MTPA) located at Angul, Odisha — environmental approval granted, 2.9 km away
- Development of Township at Kerjang, Angul, Odisha — lapsed, 3.3 km away
- Integrated Steel Plant (6 MTPA) and Captive Power Plant (810 MW) located at… — environmental approval granted, 4.1 km away
More from Jindal Steel Limited in Anugul
- Amendment in Environmental Clearance of 2x525 MW coal based Thermal Power Plant — returned to applicant
- Utkal C coal mine (ML area: 575.071 ha) — under environmental review
- Change in Name of User Agency From M/S Jindal Steel & Power Limited to M/S… — initial checks
- Expansion of existing 2x525 MW by addition of 2x800 MW coal based Thermal… — returned to applicant
- Permission for Survey and Explorations for 26 boreholes in 1147.703Ha of… — forest land use approved
- Utkal C coal mine (ML area: 575.071 ha) — returned to applicant
18 Jindal Steel projects in Anugul
All 39 Jindal Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.