Quick answers
What is 2 x 525 MW Coal Based Thermal Power Plant?
2 x 525 MW Coal Based Thermal Power Plant is an approved power project in Balichandrapur, Industrial, Anugul, Odisha. The site covers 988.4 acres.
Who is building it?
The applicant is Jindal Steel Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 13 Aug 2024), as of 27 Nov 2026.
Where is it?
In Balichandrapur, Industrial, Anugul, Odisha.
How big is it?
It has a stated cost of ₹57.6 crore and a site of 988.4 acres.
When was it filed?
The application was filed on 28 Jan 2024.
One of 3 filings for this project. The project's main page, with every filing and where each stands: 2 x 525 MW Coal Based Thermal Power Plant
Project details
| Official title | 2 x 525 MW Coal Based Thermal Power Plant at village Malibrahamani in Chhendipada Block, Dist. Angul, Odisha |
|---|---|
| Status | Environmental approval granted |
| Status since | 13 Aug 2024 |
| Application filed | 28 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Power |
| Applicant | Jindal Steel Limited |
| Land area | 988.4 acres (400 ha) |
| Project cost | ₹57.6 crore |
| Village / locality | Balichandrapur |
| Taluk / tehsil | Industrial |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01639 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 26 Dec 2025 | Environmental approval granted | 988.4 acres | ₹57.6 crore |
| New project filed 28 Jan 2024 (this page) | Environmental approval granted | 988.4 acres | ₹57.6 crore |
| Early planning filed 13 Apr 2023 | Cleared for impact study | 988.4 acres | ₹57.6 crore |
In context
17 applications in Anugul since January 2022 are in the same category (Power): 7 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 988.4 acres, this one is larger than 63% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Balichandrapur, Industrial, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 2 x 525 MW Coal Based Thermal Power Plant — environmental approval granted, 0 m away
- 2 x 525 MW Coal Based Thermal Power Plant — cleared for impact study, 0 m away
- Expansion of existing 2x525 MW by addition of 2x800 MW coal based Thermal… — returned to applicant, 0 m away
- Amendment in Environmental Clearance of 2x525 MW coal based Thermal Power Plant — returned to applicant, 200 m away
- Coal washery with capacity of 5 MTPA — environmental approval granted, 2 km away
- Development of Township at Kerjang, Angul, Odisha — lapsed, 2.4 km away
- Subhadra Open Cast Project — environmental approval granted, 3.8 km away
- Coal Washery (6.5 MTPA) located at Angul, Odisha — environmental approval granted, 4 km away
More from Jindal Steel Limited in Anugul
- Amendment in Environmental Clearance of 2x525 MW coal based Thermal Power Plant — returned to applicant
- Utkal C coal mine (ML area: 575.071 ha) — under environmental review
- Change in Name of User Agency From M/S Jindal Steel & Power Limited to M/S… — initial checks
- Expansion of existing 2x525 MW by addition of 2x800 MW coal based Thermal… — returned to applicant
- Permission for Survey and Explorations for 26 boreholes in 1147.703Ha of… — forest land use approved
- Utkal C coal mine (ML area: 575.071 ha) — returned to applicant
18 Jindal Steel projects in Anugul
All 39 Jindal Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.