Quick answers
What is this project?
Validity Extension of Environmental Clearance for Production Country Liquor From the Manufacturing Unit of M/S Bhadrasahi O.S. Shop of Sri Pramod Kumar Jaiswal is an approved industrial project in Bhadrasahi, Barbil, Kendujhar, Odisha. The site covers 0.4 acres.
Who is building it?
The applicant is Pramod Jaiswal.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Jan 2025), as of 27 Nov 2026.
Where is it?
In Bhadrasahi, Barbil, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹10 lakh and a site of 0.4 acres.
When was it filed?
The application was filed on 16 Oct 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Jan 2025 |
| Application filed | 16 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Industry |
| Applicant | Pramod Jaiswal |
| Land area | 1,800 m² |
| Project cost | ₹10 lakh |
| Village / locality | Bhadrasahi |
| Taluk / tehsil | Barbil |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00649 |
In context
38 applications in Kendujhar since January 2022 are in the same category (Industry): 9 approved, 12 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.4 acres, this one is smaller than 97% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhadrasahi, Barbil, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Validity Extension of Environmental Clearance for Production of Country Liquor… — not approved, 0 m away
- Validity Extension of Environmental Clearance for Production of Country Liquor… — not approved, 0 m away
- Proposed 132 KV Transmission Line from 132/33 KV Grid substation at Barbil to… — lapsed, 2.3 km away
- Proposed 132 KV Transmission Line from 132/33 KV Grid substation at Barbil to… — lapsed, 2.5 km away
- Raika Iron & Manganese Ore Mines of Shri Shiv Dutta Sharma over an area of… — under environmental review, 2.8 km away
- Raika Iron & Manganese Ore Mines of Shri Shiv Dutta Sharma over an area of… — not approved, 2.8 km away
- Raika Iron and Manganese Ore Mines, Shiv Dutt Sharma — more information requested, 2.8 km away
- Kasia Iron Ore & Dolomite Mining and Beneficiation Plant Project — environmental approval granted, 3 km away
More from Pramod Jaiswal in Kendujhar
- Validity Extension of Environmental Clearance for Production of Country Liquor… — not approved
- Validity Extension of Environmental Clearance for Production of Country Liquor… — not approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.