Quick answers
What is this project?
Validity Extension of Environmental Clearance for Production of Country Liquor From the Manufacturing Unit of M/S Bhadrasahi O.S. Shop of Sri Pramod Kumar Jaiswal is a rejected industrial project in Bhadrasahi, Barbil, Kendujhar, Odisha. The site covers 0.4 acres.
Who is building it?
The applicant is Pramod Jaiswal.
Has it been approved?
No. The application was rejected on 9 Mar 2026.
Where is it?
In Bhadrasahi, Barbil, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹10 lakh and a site of 0.4 acres.
When was it filed?
The application was filed on 12 Feb 2026.
Project details
| Status | Not approved |
|---|---|
| Status since | 9 Mar 2026 |
| Application filed | 12 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Industry |
| Applicant | Pramod Jaiswal |
| Land area | 1,800 m² |
| Project cost | ₹10 lakh |
| Village / locality | Bhadrasahi |
| Taluk / tehsil | Barbil |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03515 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 12 Feb 2026 (this page) | Not approved | 0.4 acres | ₹10 lakh |
| Validity extension filed 12 Nov 2025 | Not approved | 0.4 acres | ₹10 lakh |
In context
38 applications in Kendujhar since January 2022 are in the same category (Industry): 9 approved, 12 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.4 acres, this one is smaller than 97% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhadrasahi, Barbil, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Validity Extension of Environmental Clearance for Production of Country Liquor… — not approved, 0 m away
- Validity Extension of Environmental Clearance for Production Country Liquor… — environmental approval granted, 0 m away
- Proposed 132 KV Transmission Line from 132/33 KV Grid substation at Barbil to… — lapsed, 2.3 km away
- Proposed 132 KV Transmission Line from 132/33 KV Grid substation at Barbil to… — lapsed, 2.5 km away
- Raika Iron & Manganese Ore Mines of Shri Shiv Dutta Sharma over an area of… — under environmental review, 2.8 km away
- Raika Iron & Manganese Ore Mines of Shri Shiv Dutta Sharma over an area of… — not approved, 2.8 km away
- Raika Iron and Manganese Ore Mines, Shiv Dutt Sharma — more information requested, 2.8 km away
- Kasia Iron Ore & Dolomite Mining and Beneficiation Plant Project — environmental approval granted, 3 km away
More from Pramod Jaiswal in Kendujhar
- Validity Extension of Environmental Clearance for Production Country Liquor… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.