Not approvedIndustry · Kendujhar, Odisha

Validity Extension of Environmental Clearance for Production of Country Liquor From the Manufacturing Unit of M/S Bhadrasahi O.S. Shop of Sri Pramod Kumar Jaiswal.

Validity Extension of Environmental Clearance for Production of Country Liquor From the Manufacturing Unit of M/S Bhadrasahi O.S. Shop of Sri Pramod Kumar Jaiswal is a rejected industrial project in Bhadrasahi, Barbil, Kendujhar, Odisha. The site covers 0.4 acres. Its stated project cost is ₹10 lakh. As of 27 Nov 2026, its status is “Not approved” (since 9 Mar 2026).

See it on the live map All projects in Kendujhar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Validity Extension of Environmental Clearance for Production of Country Liquor From the Manufacturing Unit of M/S Bhadrasahi O.S. Shop of Sri Pramod Kumar Jaiswal is a rejected industrial project in Bhadrasahi, Barbil, Kendujhar, Odisha. The site covers 0.4 acres.

Who is building it?

The applicant is Pramod Jaiswal.

Has it been approved?

No. The application was rejected on 9 Mar 2026.

Where is it?

In Bhadrasahi, Barbil, Kendujhar, Odisha.

How big is it?

It has a stated cost of ₹10 lakh and a site of 0.4 acres.

When was it filed?

The application was filed on 12 Feb 2026.

Project details

StatusNot approved
Status since9 Mar 2026
Application filed12 Feb 2026
Approval soughtEnvironmental approval
Application typeValidity extension
SectorIndustry
ApplicantPramod Jaiswal
Land area1,800 m²
Project cost₹10 lakh
Village / localityBhadrasahi
Taluk / tehsilBarbil
DistrictKendujhar
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-03515

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Validity extension filed 12 Feb 2026 (this page)Not approved0.4 acres₹10 lakh
Validity extension filed 12 Nov 2025Not approved0.4 acres₹10 lakh

In context

38 applications in Kendujhar since January 2022 are in the same category (Industry): 9 approved, 12 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.4 acres, this one is smaller than 97% of them.

20 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bhadrasahi, Barbil, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Pramod Jaiswal in Kendujhar

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.