One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield Project of Cold Rolling Mill for manufacturing of 1,20,000 TPA Aluminium…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 16 Mar 2024 |
| Application filed | 28 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Smel Steel Structural Private Limited |
| Land area | 28.4 acres (11.5 ha) |
| Project cost | ₹893 crore |
| Village / locality | Pandloi |
| Taluk / tehsil | Rengali |
| District | Sambalpur |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00957 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Oct 2024 | Environmental approval granted | 28.4 acres | ₹893 crore |
| Early planning filed 28 Feb 2024 (this page) | Cleared for impact study | 28.4 acres | ₹893 crore |
In context
38 applications in Sambalpur since January 2022 are in the same category (Industry): 17 approved, 13 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 28.4 acres, this one is smaller than 63% of them.
25 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pandloi, Rengali, Sambalpur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Project of Cold Rolling Mill for manufacturing of 1,20,000 TPA… — environmental approval granted, 0 m away
- 4 x 12T INDUCTION FURNACE TO PRODUCE 1,14,048 TPA OF BILLETS (2 STRAND BILLET… — cleared for impact study, 450 m away
- Greenfield Steel Coil project comprising of Narrow Hot Strip Mill (6,00,000… — not approved, 500 m away
- Greenfield Secondary Metallurgical Project of Narrow Hot Strip Mill (6,00,000… — cleared for impact study, 850 m away
- Greenfield Secondary Metallurgical Project of Narrow Hot Strip Mill (6,00,000… — not approved, 850 m away
- Argon Oxygen Decarburization (AOD) in the Steel Melting Shop (SMS) to produce… — initial checks, 1.9 km away
- Argon Oxygen Decarburization (AOD) in the Steel Melting Shop (SMS) to produce… — initial checks, 1.9 km away
- Environmental Clearance as per Provision under EIA Notification No. S.O. 3250… — returned to applicant, 3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.